BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2025 at 8:00 PM

Updated August 27, 2025

Site work and paving for a mixed-use development in Danville, Virginia. Completed plans call for paving for a road / highway; for site work for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Contractor shall include in his bid price the placing and furnishing of all materials, labor, tools, equipment, traffic control, and incidentals necessary to complete the work in accordance with the plans and specifications and in accordance with all applicable sections of VDOT's Road & Bridge Specifications, current edition. General work description: Construct pedestrian traffic signal system, crosswalks, and new sidewalk at the existing signalized intersection of Riverside Drive (Route 58 BUS) and Piney Forest Road The City of Danville (the City) will receive sealed bids for construction of #REVSH21 BUS 58 Riverside Drive Pedestrian Improvements at Piney Forest Road Contractors/consultants are encouraged to take all necessary and reasonable steps to ensure that DBE firms have the maximum opportunity to compete for and perform services on contract, including participation in any subsequent supplement contracts. If the contractor/consultant intends to subcontract a portion of the services on the project, the contractor/consultant is encouraged to seek out and consider DBEs as potential Sub-contractors/sub-consultants. The contractor/Subcontractor is encouraged to contact DBEs to solicit their interest, capability and qualifications. Any agreement between a contractor/consultant and a DBE whereby the DBE promises not to provide services to other contractors/consultants is prohibited The Disadvantaged Business Enterprise (DBE) participation requirement for this contract is N/A The Contractor must obtain licensure in the Commonwealth of Virginia prior to award of contract. Prevailing wages in compliance with the Davis-Bacon Act are not required on this contract Questions may be submitted in writing via email to: purchasing@danvilleva.gov until 5:00 PM on July 7, 2025. The time of completion for this work shall be two hundred ten (210) consecutive calendar days after the date of a written "Notice to Proceed." Bonds: 5% Bid bond; 100% performance and payment bonds. Liquidated Damages: $350 dollars per calendar day. The City reserves the right to reject any or all offers and to waive informalities and minor irregularities in offers received.

Award

Roads / Highways

$247,422.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
269
Active Projects
147
Bidding Soon
1,716
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2025

August 29, 2025

Project location map

Piney Forest Rd & Riverside Dr, Danville, VA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.