Site work and paving for a road / highway in Chrisman, Illinois. Design plans call for site work for a road / highway; and for paving for a road / highway.
ob No. P-95-009-22, Phase I/II 3P Policy Designed Overlay Project, US 150 from Lower Terre Haute Rd in Paris to Laurel Ln E Of Paris, Edgar County, Region Three/District Five. This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 26, 2022, at 10:00 AM at the Region Three/District Five Office in Paris Phase I and II engineering services are required for the preparation of a project report and final contract plans, specifications, and cost estimates for the 3P Resurfacing of FAP 91 (US 150) from Lower Terre Haute Rd in Paris to Laurel Ln E Of Paris (Including Intersection at Sulphur Springs Rd / Court St) in Edgar County. The Consultant's Phase I work, if required, may consist of preparing a Project Report. This work may include data collection, Intersection Design Study, left turn lane addition studies, multi-use path addition studies, cost estimates, traffic management analysis, traffic control plans, crash analysis, quantity computations, public information meetings, stakeholder meetings and other related work items required to produce a project report. The Consultant's Phase II work, if required, may consist of preliminary and final roadway plans, special provisions, estimates, ROW plats and plans, 3D model, and any other related work required to complete Phase II. The estimated construction cost for this project is $5,400,000. The project is tentatively set for a January 2025 Letting. The completion date for this contract will be 60 months after authorization to proceed. A planned Supplement for Phase II will be done near the completion of Phase I. The Prime firms must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 029 RFQ Engineering - Phase I/II 3P Policy Designed Overlay Project *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Design
Roads / Highways
$5,400,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 25, 2023
US-150, Chrisman, IL
Related To This Project
Chrisman, IL
Bid Date: Apr 28 2022
Chrisman, IL
Bid Date: Apr 29 2022
Chrisman, IL
Bid Date: Jul 14 2022
Chrisman, IL
Bid Date: Sep 22 2023
Chrisman, IL
Bid Date: Jan 19 2024
Chrisman, IL
Bid Date: Apr 26 2024
Chrisman, IL
Bid Date: Jan 19 2021
Chrisman, IL
Bid Date: Aug 01 2024
Dolton, IL
Bid Date: Nov 16 2022
Champaign, IL
Bid Date: Feb 02 2023
Springfield, IL
--
Oak Lawn, IL
Bid Date: Nov 30 2022
Chicago, IL
--
Rock Falls, IL
Bid Date: Aug 31 2022
Chicago, IL
Bid Date: Nov 08 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.