Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Waterloo, Wisconsin. Contact the soliciting agency for additional information.
The proposals will then be evaluated by the Owner and Engineer. Unit processes for which proposals are requested include aeration diffusers, process gates, diesel standby generators and automatic transfer switches, grit chamber, grit classifier, grit pump, control system integration, submersible mixer, dry pit pumps, submersible pumps, samplers, UV disinfection, process valves, and water booster pumps. The selected equipment will be incorporated into the contract documents for the Utilitys wastewater treatment facility project, which has an estimated construction date starting in spring of 2023. This project is expected to be funded in whole or in part with funds provided by the United States Department of Agriculture -Rural Development (RD) and the Wisconsin Clean Water Fund (CWF). The project will be subject to all the requirements of these programs, including the use of American iron and steel. Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All listed iron and steel products used in this project must be produced in the United States. The term iron and steel products means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. Specific requirements are detailed in RUS Bulletin 1780-35. Federal Equal Employment Opportunity (EEO), The Offerors or Bidders attention is called to the Equal Opportunity Clauseand the Standard Federal Equal Employment Opportunity Construction Contract Specification included in the specifications. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractors aggregate workforce in each trade on all construction work in the covered area, are as follows: Goals for minority participation for each trade = 7.0% (Jefferson County) Goals for female participation in each trade = 6.9% We encourage DBEs, including MBEs and WBEs, to submit proposals. Qualification statements should explain how long the company has been manufacturing similar products, list all prior installations, and identify the locations of the nearest service center. Information provided in the qualification statement will be used in the evaluation of the proposals. RIGHTS RESERVED Waterloo Utilities reserves the right to reject any and all proposals and to waive informalities in any proposal in the best interests of the project. Published by the authority of: Barry Sorenson Utility Superintendent Waterloo Utilities, Wisconsin
Post-Bid
Water / Sewer
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 25, 2022
March 20, 2023
To Be Determined, Waterloo, WI
Related To This Project
Waterloo, WI
--
Waterloo, WI
--
Waterloo, WI
--
Waterloo, WI
--
Waterloo, WI
--
Waterloo, WI
Bid Date: Jul 13 2022
Waterloo, WI
Bid Date: May 27 2022
Waterloo, WI
Bid Date: May 19 2022
Waterloo, WI
Bid Date: Apr 28 2022
Oregon, WI
Bid Date: Aug 25 2022
Madison, WI
--
Milwaukee, WI
Bid Date: Aug 10 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.