EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 26, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Salem, Ohio. Completed plans call for the renovation of a educational facility.

Classroom Building Transformer Relocation and Re-roof - BASE BID COST COST ESTIMATE GENERAL $345,000.00--------------------------------$158,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The time for Substantial Completion is 323 consecutive days from the Notice to Proceed and shall be achieved no later than Friday, August 11th, 2023. The Bidder must include a Bid Guaranty and Contract Bond for 100% of the amount of their bid or a certified check in the amount of 10% of their total bid. See Section 153.54 of the Ohio Revised Code. Columbiana County Prevailing Wages and Equal Employment Opportunity requirements are applicable to this Project. The Bidder may be subject to a Pre-Award Affirmative Action Compliance Review in accordance with Section 123:2-5-01 of the Ohio Administrative Code including a review of the Bidder's employment records and an on-site review. This Project is subject to the State of Ohio's Encouraging Diversity, Growth, and Equity ("EDGE") Business Development Program. The Bidder is required to submit with their Bid and with their Bidder's Qualifications form, certain information about the EDGE-Certified Business Enterprise(s) participating on the Project with the Bidder. Refer to subparagraph 6.1.12 of the Instructions to Bidders. The EDGE Participation Goal for the Project is nine percent (9%). The percentage is determined by the contracted value of goods, services, materials, and labor that are provided by EDGE-certified business(es). The participation is calculated on the total amount of each awarded contract. The Bidder must indicate on the Bid Form, the locations where their services will be performed in the spaces provided or by attachment in accordance with the requirements of Executive Order 2019-12D related to providing services only within the United States. Failure to do so may cause the Bid to be rejected as non-responsive. The Bidder must confirm on the Bid Form that they are not a Russian institution or company and will comply with Executive Order 2022-02D. Failure to do so may cause the Bid to be rejected as non-responsive. Domestic Steel Use Requirements as specified in Ohio Revised Code Section 153.011 apply to this Project. Copies of O.R.C. Code Section 153.011 can be obtained from any of the offices of the Ohio Department of Administrative Services. Bidders are encouraged to be enrolled in and to be in good standing in a Drug-Free Safety Program ("DFSP") approved by the Ohio Bureau of Workers' Compensation ("OBWC") prior to submitting a Bid and provide, on the Bid Form with their Bid, certain information relative to their enrollment in such a program; and, if awarded a Contract, shall comply with other DFSP criteria described in General Conditions Paragraph 1.10 - Drug Free Safety Program Participation. The OAKS Capital Improvements ("OAKS CI") module, Ohio's Web-based project management system, is being utilized for the Project. The Contractor shall use OAKS CI module for all compatible services required under the Contract. All costs for the Contractor's use of OAKS CI for the Project shall be included in the Contract Sum, and additional compensation shall not be provided. If the Contractor is unfamiliar with the proper use of OAKS CI, the Contractor shall provide its employees for training without additional compensation. The University reserves the right to reject any or all bids.

Award

Educational

$584,400.00

Public - State/Provincial

Renovation

25

29

2

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Construction, Temporary Ramps, Vehicular Access and Parking, Temporary Roads, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Membrane Roofing
Division 08 - Openings

Division 08 - Openings

Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
147
Bidding Soon
1,407
All Active Projects
664
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2022

May 15, 2023

img_map_placeholder

2491 OH-45, Salem, OH

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Classroom Building Transformer Relocation and Re-roof

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.