BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Altamont, Tennessee. Design plans call for site work for a road / highway; and for paving for a road / highway.

Job No. P-93-044-22/D-93-090-22, Phase I and II Engineering Services, I-80 Pavement Reconstruction from 0.4 miles east of Seneca Interchange to 0.4 miles west of IL 47 Interchange, Grundy County, Region Two/District Three. This project requires 22% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 26, 2022, at 10:00 AM at the Region Two/District Three Office in Ottawa. Phase I and II engineering services are required for the preparation of a Combined Design Report (anticipated to be a Categorical Exclusion) and final contract plans, specifications, and estimates for reconstruction of I-80 between Seneca and Morris. The Phase I work includes preparation of a Combined Design Report. The work includes conducting route and land pick-up surveys, proposed design, providing maintenance of traffic, identification of roadside safety improvements, crash analysis, pavement design, and identifying drainage improvements and all other work necessary to complete the Project Report. The work also includes preparing a Location Drainage Study and Roadway Geotechnical Report. Hydraulic Reports, Structure Geotechnical Reports and Bridge Condition Reports (BCR) are needed for the structures within the study limits. Type Size and Location (TS&L) plans may be required based on the BCRs. The anticipated construction cost for this project is $100,000,000 (each direction of I-80 is to be programmed in a separate construction contract). The completion date for this contract will be 60 months after authorization to proceed. The Phase I portion is expected to be completed in 36 months and the Phase II portion is expected to be completed in 24 months. A planned Supplement for Phase II will be prepared near the completion of Phase I. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Freeways) Location Design Studies (Reconstruction/Major Rehabilitation) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 022 - RFQ Engineering - Phase I and II Engineering Services, I-80 Pavement Reconstruction

Design

Roads / Highways

$100,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
118
Bidding Soon
1,340
All Active Projects
595
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 25, 2023

August 25, 2025

img_map_placeholder

I-80, Altamont, TN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.