Site work and paving for a road / highway in Altamont, Tennessee. Design plans call for site work for a road / highway; and for paving for a road / highway.
Job No. P-93-044-22/D-93-090-22, Phase I and II Engineering Services, I-80 Pavement Reconstruction from 0.4 miles east of Seneca Interchange to 0.4 miles west of IL 47 Interchange, Grundy County, Region Two/District Three. This project requires 22% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 26, 2022, at 10:00 AM at the Region Two/District Three Office in Ottawa. Phase I and II engineering services are required for the preparation of a Combined Design Report (anticipated to be a Categorical Exclusion) and final contract plans, specifications, and estimates for reconstruction of I-80 between Seneca and Morris. The Phase I work includes preparation of a Combined Design Report. The work includes conducting route and land pick-up surveys, proposed design, providing maintenance of traffic, identification of roadside safety improvements, crash analysis, pavement design, and identifying drainage improvements and all other work necessary to complete the Project Report. The work also includes preparing a Location Drainage Study and Roadway Geotechnical Report. Hydraulic Reports, Structure Geotechnical Reports and Bridge Condition Reports (BCR) are needed for the structures within the study limits. Type Size and Location (TS&L) plans may be required based on the BCRs. The anticipated construction cost for this project is $100,000,000 (each direction of I-80 is to be programmed in a separate construction contract). The completion date for this contract will be 60 months after authorization to proceed. The Phase I portion is expected to be completed in 36 months and the Phase II portion is expected to be completed in 24 months. A planned Supplement for Phase II will be prepared near the completion of Phase I. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Freeways) Location Design Studies (Reconstruction/Major Rehabilitation) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 022 - RFQ Engineering - Phase I and II Engineering Services, I-80 Pavement Reconstruction
Design
Roads / Highways
$100,000,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 25, 2023
I-80, Altamont, TN
Related To This Project
Altamont, TN
Bid Date: Sep 23 2022
Altamont, TN
Bid Date: Dec 07 2022
Altamont, TN
Bid Date: Apr 15 2022
Altamont, TN
Bid Date: Dec 20 2023
Altamont, TN
Bid Date: Mar 08 2024
Altamont, TN
Bid Date: Jun 16 2023
Altamont, TN
Bid Date: Oct 12 2023
Altamont, TN
Bid Date: Apr 05 2022
Altamont, TN
Bid Date: Oct 25 2022
Altamont, TN
Bid Date: Oct 28 2022
Murfreesboro, TN
--
Memphis, TN
Bid Date: Dec 07 2022
Smyrna, TN
Bid Date: Jul 19 2023
Smyrna, TN
Bid Date: Nov 14 2024
Harriman, TN
Bid Date: Aug 14 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.