BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Meadville, Mississippi. Contact the soliciting agency for additional information.

The Town of Meadville, Mississippi, intends to employ a consulting engineering firm to provide an engineering services contract for an American Rescue Plan Act (ARPA): Mississippi Municipality and County Water Infrastructure Grant Program Act (MCWI). The project will utilize ARPA funding and consists of water infrastructure improvements in Franklin County, Mississippi. The Consultant's scope of service includes, but is not limited to, grant application; administration, planning, surveying and development of construction plans; specifications and preparation of easements; right-of-way maps and deeds for purchase, environmental related services, bidding phase services, construction engineering and ad inspection services in accordance with federal, state and local laws, regulations and policies. Upon selection, negotiation and execution of contract, the Town of Meadville anticipates the duration of the contract to be approximately two (2) years. We anticipate executing the contract within approximately sixty (60) days. Consulting engineering firms (CONSULTANTS) interested in providing these services may so indicate by furnishing the Town of Meadville one (1) original and three (3) copies plus a digital version of their proposals, which should consist of the following: 1) A cover letter specifying the name and complete description of the project, the name of the project manager and the location and address of the office to be assigned the majority of the work; 2) A resume for each principal member, the project manager and employee(s) of the firm anticipated to be assigned the project. Also, provide an organizational chart and list each person's experience and qualifications, including proof that the Project Manager is licensed as a Mississippi Professional Engineer and that the firm has met state licensure and certification requirements; 3) A description of similar work completed during the past five (5) years which qualifies the Consultant for this work; the Consultant's cost and the Consultant's schedule completion and actual completion of this work; 4) Provide any information to indicate that the team has the necessary resources, including available staff, to complete the project within the timeframe above. The Consultant should indicate any other active and planned projects that any individuals, as listed on the organization chart (including any Subconsultant(s), are currently working to complete. The Consultant should indicate how they plan to balance workloads to commit the staff and resources to successfully complete the project on time. The Town of Meadville will evaluate the proposal based on the following factors listed in their relative order of importance: 1) The experience in performing the type of work outlined herein; 2) Qualifications of the principals and professionals to be assigned; 3) The consultant's experience in working with projects involving public funding; 4) The extent of in-house capabilities of the firm; and 5) The consultant's size and capability of available staff to perform this work in accordance with an expedited progress schedule, considering the form's content and planned workload. The Town of Meadville reserves the right to select one (1) Consultant or select a short list of Consultants from whom more information will be required. The Town of Meadville reserves the right to reject any and all Proposals, discontinue Contract execution and/or request additional information with any party at any time prior to final Contract execution. The Method of Contractor Selection has not been determined at this time.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
15
Bidding Soon
304
All Active Projects
130
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2023

img_map_placeholder

Multiple Locations, Meadville, MS

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.