BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 15, 2024 at 7:00 PM

Updated February 16, 2024

Demolition, site work, renovation and addition to a mixed-use development in Union Grove, Wisconsin. Completed plans call for the addition of a 3,086-square-foot, two-story above grade military facility; for the demolition of a military facility; for the renovation of a 6,171-square-foot, two-story above grade military facility; for site work for a military facility; religious / funeral development; religious / funeral development; religious / funeral development; and religious / funeral development.

All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $50,000. All bids received from contractors who are not certified will be rejected This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Site contact person is Lee Kelley, Director of Southern Wisconsin Veterans Memorial Cemetery Division of Veterans Benefits, Bureau of Veteran Cemeteries and Memorial Service Wisconsin Department of Veterans Affairs 21731 Spring Street, Union Grove, WI 53182 t 262.878.5660 | f 262.878.5664 In general, the work consists of construction of a 2,800 sq ft two story building addition to the west. The addition structure is brick and block exterior bearing walls with wood structural roof framing. Interior spaces include office workspace, an elevator, family meeting rooms, waiting room, and an overlook area. The overlook has a canted two story glass curtain wall system. Interior work includes drywall partitions and interior finishes throughout. Project also includes casework and a single use toilet room. A new enclosure entry space of curtainwall to the east for visitors and reception. Systems include new HVAC system to accommodate the addition and interior renovations, addition of a building fire alarm system. Electrical, Data, and plumbing modifications to accommodate the building addition and interior renovations. Site work includes new sidewalks, rework of potion of asphalt drive, lower level canopy structure, grave locator canopy structure at entry, and a new condensing unit pad. PN -2112.01

Post-Bid

Military

$2,160,000.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

86

41

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
489
Active Projects
276
Bidding Soon
3,328
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2024

April 8, 2024

Project location map

21731 Spring St, Union Grove, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.