Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Dacula, Georgia. Completed plans call for site work for a water / sewer project.
The Project consists of, but is not limited to the following major elements: Construction of approximately 240 linear feet of 6" diameter PVC gravity sewer and service lateral, two new sewer manholes, connection to existing Gwinnett County sewer manhole, connection to existing service laterals, decommissioning an existing septic system, and site restoration. To bid this project, Contractor must be prequalified and listed on the Approved Utility Contractor's List with the Gwinnett County Department of Water Resources. If not prequalified, your bid will not be accepted. All bids will be evaluated by OWNER and the project will be awarded, if it is awarded, within sixty (60) days of the bid opening. Time of completion for all work associated with this project shall be NINETY (90) consecutive calendar days from the date of a written "Notice to Proceed" from OWNER. OWNER requires a bid bond* or a certified cashier's check in the amount of five percent (5%) of the total bid to be enclosed with the bid at the time of bid opening. Cashier's check will be made payable to the City of Dacula, Georgia. The successful bidder will be required to furnish OWNER with Insurance, Workman's Compensation Insurance, and Performance and Payment Bonds* in the amount of one-hundred percent (100%) of the total bid. CONTRACTORS and SUBCONTRACTORS bidding on this Project will be required to comply with all Federal, State, and local laws. OWNER reserves the rights to waive any informalities or to reject any or all Bids, to evaluate Bids, and to accept any Bid which in its opinion may be in the best interest of the OWNER. No Bid will be rejected without just cause. * Surety companies executing Bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State of Georgia. This project is funded through the American Rescue Plan Act.
Post-Bid
Water / Sewer
$300,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 8, 2022
October 7, 2022
442 Harbins Rd, Dacula, GA
Related To This Project
Dacula, GA
Bid Date: Nov 04 2021
Dacula, GA
Bid Date: Sep 26 2022
Dacula, GA
Bid Date: May 26 2022
Dacula, GA
Bid Date: Jan 18 2023
Dacula, GA
Bid Date: Feb 21 2023
Dacula, GA
--
Dacula, GA
Bid Date: Feb 21 2023
Dacula, GA
Bid Date: Apr 11 2023
Dacula, GA
Bid Date: Jul 22 2021
Dacula, GA
--
Dacula, GA
Bid Date: Aug 18 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.