BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, FURNISH AND INSTALLATION OF SIGNAGE, BARRICADING, ETC.; Construct asphalt concrete speed humps at these locations: ST211210249 N. 10th St. - W. Abert Pl. to W. Capitol Dr. 2 ST211210250 N. 11th St. - W. Burleigh St. to W. Ring St. 2 ST211210253 N. 14th St. - W. Olive St. to W. Hauser Ave. 1 ST211220113 S. 17th St. - W. Becher St. to W. Rogers St. 1 ST211210255 N. 23rd St. - W. Capitol Dr. to W. Hope Ave. 2 ST211210256 N. 24th St. - W. Capitol Dr. to W. Hope Ave. 2 ST211210257 N. 25th St. - W. Capitol Dr. to W. Hope Ave. 2 ST211210276 N. 26th St. - W. Clybourn St. to W. Wisconsin Ave. 2 ST211210277 N. 26th St. - W. Hampton Ave. to W. Stark St. 1 ST211220111 S. 26th St. - W. Scott St. to W. Mineral St. 1 ST211220110 S. 29th St. - W. Greenfield Ave. to W. Scott St. 1 ST211210287 N. 30th St. - W. Auer Ave. to W. Concordia Ave. 1 ST211220109 S. 33rd St. - W. Lincoln Ave. to W. Grant St. 1 ST21121020S N. 37th St. - W. Silver Spring Dr. to W. Thurston Ave. 2 ST211210283 N. 38th St. - W. Townsend St. to W. Keefe Ave. 1 ST211220121 N. 39th St. - W. Auer Ave. to W. Fond Du. Lac Ave. 1 ST211220124 N. 40th St. - W. Marion St. to W. Congress St. 1 ST211210278 N. 40th St. - W. Stark St. to W. Fairmount Ave. 1 ST211210279 N. 40th St. - W. Thurston Ave. to W. Florist Ave. 3 ST211210285 N. 41st St. - W. Nash St. to W. Roosevelt Dr. 2 ST211210280 N. 42nd St. - W. Fairmount Ave. to W. Lancaster Ave. 1 ST211210284 N. 46th St. - W. Townsend St. to W. Keefe Ave. 1 ST211210269 N. 48th St. - W. Auer Ave. to W. Concordia Ave. 1 ST211210267 N. 50th St. - W. Center St. to W. Hadley St. 1 ST211210286 N. 50th St. - W. Parkway Dr. to W. Hampton Ave. 4 ST211220120 N. 52nd St. - W. Burleigh St. to W. Auer Ave. 1 ST211210230 N. 53rd St. - W. Marion St. to W. Congress St. 1 ST211210281 N. 53rd St. - W. Villard Ave. to W. Custer Ave. 3 ST211210271 N. 54th St. - W. Auer Ave. to W. Concordia Ave. 1 ST211210282 N. 54th St. - W. Fairmount Ave. to W. Villard Ave. 3 ST211210288 N. 56th St. - W. Keefe Ave. to W. Nash St. 1 ST211210268 N. 58th St. - W. Fairmount Ave. to W. Villard Ave. 3 ST211210289 N. 70th St. - W. Courtland Ave. to W. Hampton Ave. 1 ST211210290 N. 72nd St. - W. Carmen Ave. to W. Bobolink Ave. 1 ST211220133 N. 72nd St. - W. Silver Spring Dr. to W. Thurston Ave. 1 ST211220129 N. 75th St. - W. Chambers St. to W. Burleigh St. 1 ST211220107 N. 85th St. - W. Fairmount Ave. to W. Lancaster Ave. 1 ST211220112 W. Arthur Ave. - S 14th St. to S. 15th St. 1 ST211190119 W. Brentwood Av. - N. 85th St. to N. 89th St. 4 ST211220135 W. Brown St. - N. 17th St. to N. 18th St. 1 ST211220115 W. Courtland Ave. - N. 70th St. to N. 72nd St. 2 S1211220136 W. Euclid Ave. - S. 9th Pl. to S. 10th St. 1 ST211220134 W. Hadley St. - N. Grant Blvd. to N. Sherman Blvd. 1 ST211220117 W. Hope Ave. - N. 61st St. to N. 62nd St. 1 ST211220118 W. Hope Ave. - N. 74th St. to N. 75th St. 1 ST211220122 W. Kiley Ave. - N. 37th St. to N. 40th St. 2 ST211210237 W. Leon Tr. - W. Baldwin St. to W. Armitage Ave. . 2 ST211220114 S. Pearl St. - W. Burnham St. to S. 18th St. 3 ST211220132 W. Ruby Ave. - N. 73rd St. to N. 74th St. 1 ST211210236 W. Scranton Pl. - W. Custer Ave. to W. Sheridan Ave. 2 ST211210275 W. St. Paul Ave. - N. 34th St. to N. 35th St. 1 ST211210235 W. Thurston Ave. - N. 73rd St. to N. 74th St. 1 ST211220156 2022 Existing Speed Hump Maintenance - list to be determined by Supervisor 9 ST221220317 WSA: N. 31st St. -W. Vine St. to W. Brown St.; N.32nd - W. Lisbon Ave. to W. Brown St.; W. Brown St. - N. 31st to N. 32nd St. Time for Completion: All work on the locations without utility work shall be completed by October 1, 2022. The completion date for the locations that have utility work is November 1, 2022. Any additional locations added to this contract shall be assigned completion dates as necessary to ensure the timely completion of the contracted work. Liquidated Damages, per diem: $500.00/Day The residency requirements for this project have been waived. This project includes American Rescue Plan Act (ARPA) funding. Bidders must review and abide by the City's ARPA SWMBE Contract Compliance Procedures. The SMWBE/LSA requirement for this project is 7% of the contract base bid. The SMWBE/LSA Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SMWBE certificates must be submitted with the Form A. If the forms are not filled out properly, it will be cause for rejection of the bid. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid.

Award

Roads / Highways

$547,275.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
99
Bidding Soon
2,395
All Active Projects
882
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 19, 2022

September 19, 2022

November 1, 2022

img_map_placeholder

Multiple Locations, Milwaukee, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.