BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Chesapeake, Virginia. Completed plans call for site work for a water / sewer project.

Alternative Onsite Sewage System Installation Project (2022-ER-70) Address: 2109 Cuffee Rd. Chesapeake, VA 23322 Small Business Set-Aside Award Priority Scope of work: The contractor shall furnish all labor, supervision, equipment, tools, parts, supplies and materials, as necessary, to perform the services as described herein: Cost for Line Item #1 (include total cost for items A-L) These are known factors. Vendors must invoice for actual cost incurred as described herein A) Construct an onsite sewage system that meets the location and construction specifications of the Virginia Sewage Handling and Disposal Regulations (12VAC5-610-10 et seq., the Regulations). B) Construct the above onsite sewage disposal system in compliance with the Chesapeake Health Department Construction Permit 234-22-217 at 2109 Cuffee Rd. Chesapeake, VA 23322 in the location shown on the permit. The permit may contain additional conditions, notes, and information needed to construct the onsite sewage system. C) Provide, or subcontract with a licensed plumber and electrician to provide plumbing and electrical required to convey the wastewater from the house to the onsite sewage system as required by the Regulations and the Virginia Uniform Statewide Building Code. This includes obtaining or assuring that the owner obtains all permits and inspections necessary by the local building authority in compliance with the Virginia Uniform Statewide Building Code. D) Septic Pump-out Requirements: To prevent sewage from continuing to back up into the home or property surface while waiting for the septic work to start, the contents of the existing septic tank shall be pumped by a properly licensed sewage hauler 14 days from signature of the Notice to Proceed and every 21 days thereafter until one week prior to the installation of the system. If the permit requires work within or under the existing drainfield (as indicated in the Permit) the contents of the existing septic tank shall be pumped out every 48 hours for one week prior to the installation or repair of the onsite sewage system in order to dry out the drainfield. E) Tree Removal and Site Clearing: A pre-bid site visit is recommended to determine if any tree removal or site clearing may need to occur. If stated in the above referenced Permit, remove any trees and wood debris as described in the permit and haul away wood and debris unless notified otherwise. Costs of tree removal and site clearing should be included in initial bids. Any additional site clearing or tree removal required during installation must be submitted in writing to and approved by VDH in writing including an additional cost estimate. Remove trees 10 feet from new drain field if listed in the above referenced permit and haul away wood and debris unless notified otherwise. F) Abandon any unused component of the former onsite sewage system as specified by the Chesapeake Health Department Construction Permit 234-22-217. Upon completion of the onsite sewage system repair, the existing 1,000 gallon septic tank shall be pumped by a properly licensed sewage hauler, the tank crushed in place, lime placed over the crushed tank, and the tank hole filled with clean backfill material and restoring the area to its original condition. Abandonment may also include removing unused sewer line and conveyance lines and crushing and filling the distribution box. G)Operation and Maintenance Requirements: Provide or subcontract for two years of operation and maintenance for the subject property of the installed Alternative Onsite Septic System per Regulations for Alternative Onsite Sewage Systems(the AOSS Regulations, 12 VAC 5-613) unless included in the purchase price of the treatment unit. Operation and maintenance agreement should include a minimum of one annual maintenance visit and any samples as required by regulation. This is provided to assist the homeowner at meeting their first two years of O&M requirements per the Owner's Operation and Maintenance Manual and Regulations for Alternative Onsite Sewage Systems of the Virginia Department of Health (12VAC5-613-100 et seq.). Contractor should provide a copy of the O&M agreement to the homeowner and provide a copy to VDH. H) Follow all regulations and permitting pertaining to erosion and sediment control including stabilizing, seeding and grading the site after construction to return to the original state. Control construction runoff with proper practices so as not to become a nuisance to the owner or to neighboring properties or cause sediment to be discharged into state waters and drainage ditches. Any construction debris must also be removed from the site and disposed of properly. I) Bidders shallcomply with all requirements of the Department of Professional and Occupational Regulations (DPOR) for contracting and executing the contract with the Virginia Department of Health. Must provide a copy of Class A, B, or C Contractors license from DPOR, Alternative Sewage Disposal System Contracting (ADS) specialty from DPOR, Master Alternative Onsite Sewage System Installer license from DPOR, and proof of insurance.Bidders contacted by VDH to provide any missing required documents, must provide the document within 24 business hours or their bid will be considered non-responsive. J)Obtain a final installation inspection from the private OSE/PEand local health department, and assure that the onsite sewage system complies with the Regulations. K)Provide all required documentation to the Chesapeake Health Department following completion of construction and obtain an Operation Permit for the onsite sewage system. L) Submit invoice to VDH_SWAP_Grant@vdh.virginia.gov once Local Health Department has issued the Operations Permit. Include a copy of the completion statement and operations permit. Additional Services (If Needed) Bidder must contact VDH Project Manager listed on the Notice to Proceed for approval prior to any additional services performed. VDH will issue a change order for actual additional services rendered. The contractor shall furnish all labor, supervision, equipment, tools, parts, supplies and materials, as necessary, to perform the services as described herein: A. Additional materials B. Additional labor and equipment. Breakdown of Total Cost When responding to solicitation Bidders must attach a document listing breakdown of total cost for line item 1. Bidders must attach a separate breakdown of cost for additional services. Additional cost should not be included in line item 1 bid submission. Additional questions: Contact Angelica Cipara via email: angelica.cipara@vdh.virginia.gov Notice to Proceed If Bidder is selected for award, the Bidder shall be required to provide a signed Notice to proceed form within 3 business days of notification. VDH will provide a form for signature.

Award

Water / Sewer

$36,581.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
36
Bidding Soon
665
All Active Projects
258
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2022

October 26, 2022

img_map_placeholder

2109 Cuffee Rd, Chesapeake, VA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.