BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Bremerton, Washington. Contact the soliciting agency for additional information.

This Contract provides for the improvement of pavement markings on select City of Bremerton streets. The work includes, but is not limited to, removing pavement markings, installing pavement markings, temporary traffic control, and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. The work will be completed as a 3-year unit priced contract as allowed by RCW 35.22.620. Contractors should read all language in the Contract Documents including the Special Provisions carefully. The City may exercise the option of extending the unit priced contract for 1 additional year. Work will be authorized annually using a Work Order form. Estimated annual quantities for each category of work are included in the Bid Schedule. Refer to notes on the Proposal Form for information on bid evaluation procedures and annual adjustment of the unit prices. Engineer's Estimate for this project is $300,000 to $320,000 for Work Order 1 (2022) and approximately $320,000 per Work Order for subsequent Work Orders over the Contract term. Each bid proposal shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in an amount equal to five percent (5%) of the Total Bid Price shown in the Bid Schedule. The failure to furnish a bid deposit of a minimum of 5 percent shall make the bid nonresponsive and shall cause the bid to be rejected by the Contracting Agency. : The successful bidder will also be required to provide a Performance Bond for 100 percent of the Total Bid Price shown in the Bid Schedule. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of Bremerton. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Roads / Highways

$320,000.00

Public - City

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
31
Bidding Soon
881
All Active Projects
368
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2022

September 23, 2022

img_map_placeholder

Multiple Locations, Bremerton, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.