BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Mount Pleasant, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The kinds and approximate quantities of the major items of work include: 550 C.Y. of Excavation Class 10 Roadway & Borrow. 300 C.Y. of Modified Subbase. 1500 S.Y. of Engineering Fabric. 1640 S.Y. of PCC Pavement, Driveway & Sidewalk Removal. 1500 S.Y. of 6 IN. thick fully reinforced PCC Street Paving. 140 S.Y. of Driveway. P.C. Concrete, 6 IN. 2 EACH of SW-508 Intake. 32 L.F. of 18" HDPE Storm Sewer Pipe. 950 L.F. of 4" Longitudinal Subdrain including Porous Granular Bedding & Backfill; and associated work as normally found in a street paving improvement project. All work is to be done in compliance with the drawings and specifications prepared by Warner Engineering Associates Inc., Mount Pleasant, Iowa which are now on file for public examination at the ENGINEERS office and the City Clerk's office in Mount Pleasant, Iowa. Each bid shall be made on a form furnished by the ENGINEER and accompanied by a bidder's bond with corporate surety satisfactory to the governing body, a check drawn on and certified by an Iowa bank or a U.S. chartered bank, or a certified share draft drawn on an Iowa credit union, and filed in a sealed envelope separate from the one containing the bid and in an amount at least equal to ten percent (10%) of the amount of the bid, made payable to the City of Mount Pleasant, Mount Pleasant, Iowa, and may be cashed by the City of Mount Pleasant, Mount Pleasant, Iowa as liquidated damages in the event the successful Bidder fails to enter into a contract within ten (10) days after award of the Contract and post bond satisfactory to the City of Mount Pleasant insuring the faithful performance of the Contract. The bid security of the lowest three Bidders may be retained for a period of not to exceed sixty (60) days until a contract is awarded or rejection made. Other bonds or checks shall be returned after a tabulation of bids is completed Payment to the Contractor for completed work will be made by the City of Mount Pleasant; in cash from such funds as may be legally used for said purposes. Payment to the Contractor shall be made on estimates twice monthly equivalent to ninety-five percent (95%) of the Contract value of the work completed during the preceding calendar month. The Contractor shall submit requests for payment for work to Warner Engineering Associates Inc. at least seven (7) days before the first City Council meeting of each month. The Engineer shall forward to the City Administrator for payment each signed estimate before the City Council meeting in question. Payment shall be made to the Contractor by the City within seven (7) days of approval by the City Council. Final payment of the remaining five percent (5%) for work shall be made not less than thirty-one (31) days after completion and acceptance by resolution of the City Council of the completed contract, assuming that no unpaid claims remain on file, and subject to the conditions in accordance with the provisions of Chapter 573 of the Code of Iowa. The successful Bidder shall be required to furnish a Performance and Payment Bond in an amount equal to one hundred percent (100%) of the Contract price, said bonds to be issued by a responsible surety approved by the City Council; and shall guarantee faithful performance of the Contract and the terms and conditions therein contained, and shall guarantee the prompt payment of all materials and labor and protect and save harmless the City from the claims and damages of any kind caused by the operation of the Contractor; and shall guarantee maintenance of the improvements for a period of two (2) years from and after its completion and acceptance by the City Council. A Notice to Proceed shall be issued upon execution of the Agreements by the City. The Mount Pleasant North Aldrin Drive from West Vine Street to West Armstrong Court - Street Improvements 2023, for Mount Pleasant, Iowa, shall be fully completed on or before August 15, 2023. The Bidder agrees to pay as liquidated damages the sum of $500 for each consecutive calendar day after August 15, 2023, that all work is not fully completed A contract will be awarded for all the work, to the single successful bidder complying with this Notice and the Instructions to Bidders. The City Council reserves the right to reject any or all bids and to waive technicalities and irregularities. A tabulation of bids received will be prepared and shall be presented and acted upon by the City Council of Mount Pleasant, Iowa at a meeting to be held after the Public Hearing at 5:30 P.M. on the 25th day of January 2023 at the City Hall, 307 East Monroe St., Mount Pleasant, Iowa 52641. By virtue of statutory authority, preference shall be given products and provisions grown and coal produced by the State of Iowa and to Iowa domestic labor to the extent lawfully required by Iowa Statutes, providing that the award of the Contract will be to the lowest responsible bidder complying with this Notice and the instructions to Bidders. The City of Mount Pleasant reserves the right to reject any or all bids and to waive technicalities and irregularities.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

9

7

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
39
Bidding Soon
384
All Active Projects
177
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 24, 2023

February 24, 2023

img_map_placeholder

N Aldrin St, Mount Pleasant, IA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.