Published December 13, 2022 at 7:00 PM
Updated January 26, 2024
Demolition, site work, renovation and addition to a civil project in Hardeeville, South Carolina. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.
Beaufort Jasper Water and Sewer Authority (BJWSA) owns and operates the Purrysburg WTP (PWTP), currently rated for 15 MGD, that supplies potable water to southern Beaufort and Jasper Counties. The PWTP was constructed in 2004 and designed to accommodate 2 additional 15 MGD expansions. Due to the continued rapid growth in the service area, PWTP is in need of the 1st planned 15 MGD expansion. Therefore, BJWSA is seeking qualified contractors interested in the design-bid-build expansion project which consists of the following: modifications to the river, reservoir, transfer, and high service pump stations; chemical feed facility improvements; weir flow splitting facility; PAC contactor; static rapid mix equipment; flocculation and sedimentation basins; dual media filters; plant support facilities; miscellaneous valves and piping; instrumentation and controls; electrical work; and civil/site work to include clearing and grubbing. Performing all of the Purrysburg WTP Expansion to 30 MGD - Phase II work including, but not limited to, River Pump Station Upgrades, Reservoir Pump Station Upgrades, Transfer Pump Station Upgrades, High Service Pump Station Upgrades, PAC Contactor Construction, PAC Silo Construction, Flocculation Construction, Sedimentation Basin Construction, Filtration Construction, Administration Modifications, and Chemical Feed Modification Sodium Hypochlorite Area Polyurethane Leak Stop Injection instrumentation and SCADA integration associated with Phase II Clearing and grubbing, civil/site work, etc. Installation of new pumps in River, Reservoir, Transfer, and High-Pressure Pump Stations. Upgrading Chemical Feed Facility (addition of tanks, pumps, sodium hypochlorite onsite generation equipment, and PAC Storage & Feed silo) Construction of weir flow splitting facility Construction of PAC contactor Installation of Static Rapid mix equipment Construction of new Flocculation and Sedimentation Basin Construction of 5 new Dual Media Filters Construction of additional Plant Support Facilities Miscellaneous valves and piping. Instrumentation and Controls Electrical work and controls. Deadline to submit Questions Nov 8th 2022, 5:00 PM EST Work substantially complete the project within 821 consecutive calendar days and to fully complete the project within 913 consecutive calendar days
Award
Water / Sewer
$42,810,000.00
Public - State/Provincial
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.