BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Toronto, Ontario. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Question Deadline: 08/30/2023 at 3:00 PM ET The scope of work of this contract includes but is not limited to: - Construction of one abutment on the east side of the Don Valley Parkway (DVP) and one on the west side of the Don River. Each abutment consists of two (2) 2.4m diameter deep foundation caissons socketed into bedrock; - Construction of the bridge superstructure for a tied arch 120 metre clear span that will carry two (2) Ontario Line tracks over the Don Valley Parkway ("DVP") and Don River; - Construction of cut and cover structures and portal structures. - Installation of Support of Excavation (SOE) which includes permanent structural lining of the OL cut and cover tunnels and portal, and tunnel headwall with pile block; - Track relocations and removals within the project area to provide space for the proposed SOE construction and final track alignments; - Construction of Hydro One Network Inc (HONI) foundations, installation of HONI monopole and wire relocation; - Construction of the Emergency Service Building (ESB) and connections to City of Toronto service infrastructure; - Construction and Installation of a noise barrier structure; - Construction of a Wet-Well for tunnel stormwater drainage; - Associated Utility and Signal Relocations to facilitate the construction of the above; and - Site remediation and restoration as required. The Work is located within the West Don Lands Rail Corridor (Closest Address: 155 Bayview Ave, Toronto, ON M5A OG4) SCHEDULE INFORMATION: Baseline Tracking Milestone: Lower Don Bridge East Abutment - April 1 2024. Interim Milestone 1: Hydro One Transmission Line Relocate - April 30, 2025. Interim Milestone 2: Handover Termination Block Headwall - August 5, 2025. Interim Milestone 3: Northern Track Shift in service - April 1, 2026. Interim Milestone 4: Handover Cut and Cover Structure - April 20, 2026. Substantial Completion - August 31, 2027. Only those Proponents that Metrolinx has determined, in its sole discretion based on the Evaluation Criteria stated herein, to be qualified will be added to the Metrolinx Prequalified List of Contractors for the Work. Official bid documents must be obtained from www.metrolinx.merx.com and bid submissions must be done through the Merx platform. RFS-2019-NAFC-110

Post-Bid

Bridges / Tunnels

$10,000,000.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
473
Active Projects
276
Bidding Soon
4,374
All Active Projects
1,779
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 22, 2023

April 1, 2024

img_map_placeholder

155 Bayview Ave, Toronto, ON


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.