BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 16, 2022 at 8:00 PM

Updated September 15, 2023

Site work for a military facility in Marshfield, Wisconsin. Completed plans call for site work for a military facility.

This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general, the work consists of installing 2,760 linear feet of fencing, including a chop and a slide gate to provide security for the entire Armory. The fencing project will implement force protection measures to protect personnel, control site access and create a standoff distance between public roads and areas at the property boundary with the military equipment and facilities. The fencing will include a UFC standard security fence topped with three strands of barb wire for protection. To minimize maintenance a gravel base will be added along the bottom perimeter of the fence to minimize landscaping. The project will also include electrical and lighting upgrades. The electrical upgrades will provide power and control cabling for the required entrance fence gates. Additional lighting is also required to improve security within the armory grounds. The added lighting will also offer additional improvements for training and yard activities. Bidder shall identify the division of work they are bidding on when requesting Bidding Documents online. Base Bids will be received as a single lump sum bid for: 5) Electrical. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. NOTICE: The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Award

Military

$153,995.00

Public - State/Provincial

Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
25
Bidding Soon
434
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2022

February 1, 2023

Project location map

201 S Oak Ave, Marshfield, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.