Renovation of a mixed-use development in Stevens Point, Wisconsin. Completed plans call for the renovation of a educational facility; and laboratory facility.

Data Center Relocation Chemistry-biology Building Effective January 1, 2014, all potential bidders must be certified by DOA prior to submitting bids on state construction projects over $50,000. All bids received from contractors who are not certified will be rejected. This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general, the work consists of combining and slightly expanding an existing server room and telecommunications room into a larger server room. Scope of work includes minor selective demolition, construction of new architectural walls, installing new floor and ceiling finishes, painting,roof patching, installing new server racks and associated equipment, installing a chemical agent firesuppression system in the new server room, and providing new HVAC equipment to support the server room Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted.

Under Construction

Educational

$1,004,400.00

Public - State/Provincial

Renovation

34

5

16

12

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
17
Bidding Soon
233
All Active Projects
94
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 28, 2022

October 31, 2022

img_map_placeholder

2101 4th Ave, Stevens Point, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.