BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a residential development in Laredo, Texas. Completed plans call for the renovation of a residential development.

The City of Laredo has established a local vendor preference ordinance 2018-O-175. All informal and formal Requests for bids for contracts will be evaluated with a 5% preference for local vendors. The purpose of this project is to replace old VCT tile, baseboard, and upgrade to ceramic tile system for entire unit at 515-B Teakwood Ln. Property of 980 Sq ft. Work shall include but not limited to demolition and removal of the existing VCT floor tile, floor base board and Exhaust bathrooms fans. Provide materials, tools, supervision and all other work to perform this project. General requirements: All work shall comply with the City of Laredo municipal housing general requirements. Work specifications shall comply with all building codes currently adopted by City of Laredo. Contractor shall keep job clean, safe and in an orderly manner contractor will be solely responsible for obtaining and paying for all required city permits. Request for construction progress inspections and all final inspections of this project as well any certificates/licenses required by the State of Texas and or City of Laredo. Contractor shall familiarize himself/herself with the scope of the project, existing conditions, and proposed improvements to the project.no additional compensation will be given to the contractor for failure to visit the job site and familiarize himself/herself with the project as noted above. The contractor is responsible for the project locations as well as his workforce, subcontractors and all others associated with the work to be performed on the project. The contractor shall furnish all new materials where required, which are to match existing materials in size, thickness, texture, finish, design, and value. The contractor shall be responsible for any damages caused to the owner property during the construction operations. The contractor shall make sure that all existing items and systems in the home and improvements to be made are in complete working order upon competition of the project. The contractor shall provide all necessary labor, materials and equipment to complete this project. The contractor shall provide a written warranty of one year on all materials and workmanship to the owner and the municipal housing division upon competition of project. Contractor shall provide all required forms to the owner for selection. Temporary services: Contractor shall provide a portable toilet and trash dumpster/dump truck at the job site prior to starting the project. Failure to provide these services will result in a change order credit towards the homeowner as determined by LMH. Remove existing items: All items removed shall be properly disposed of, removed from site and hauled to the City of Laredo landfill on a daily basis. Remove all existing items as per project specifications. Electrical: Provide and install exhaust fans, gfci, and all necessary work to perform this job on both bathrooms. Provide and install tape, float for the properly installation of the exhaust fans and bathrooms vanity installation. Floor covering: Provide and install new 12x12 ceramic tile floor for the entire property consisting of 2 bedrooms 2 baths, living room, dining room, hallways, closets, pantry and all other areas that require ceramic tile installation. Provide and install versa bond thin set for ceramic tile layout. Provide install grout mortar to fill all ceramic tile joints. Carpentry: Provide and install a 3 1/2 colonial wood prime base board for the entire property and the same time paint them with oil white paint and sealed bottom and top areas of the wood trim. Demolition: Contractor shall remove all old VCT floor, outdoor siding, baseboard, existing windows and exhaust fans and dispose properly to landfill. Warranty: Contractor shall provide a one-year warranty on all workmanship and materials. Turning over of the project: Contractor shall have 35 calendar days to complete the project Before turning over the project to the owner and the municipal housing, the contractor shall ensure that the premises are clean and free of debris. Provide grounds maintenance included trees. Time schedule: Contractor shall have 35 calendar days to complete the project in its entirety upon PO issuance

Post-Bid

Residential Subdivision

$6,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
5
Bidding Soon
116
All Active Projects
46
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.