BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Glenmora, Louisiana. Completed plans call for the renovation of a educational facility.

Bids shall be accepted only from contractors who are licensed under LA-R.S.37:2150-2163 for the classification of MECHANICAL. Note, this bid is for a Davis Bacon prevailing wage project. The Instructions to Bidders, Bid Form, Agreement Between Owner and Contractor, Forms of Bid Bond, Performance Bond and Payment Bond, Drawings and Specifications, and other Contract Documents may be examined at the following location: ADG ENGINEERING 3909 W CONGRESS STREET, SUITE 201 LAFAYETTE, LOUISIANA 70506 The OWNER reserves the right to reject any or all bids for just cause; such actions will be in accordance with Title 38 of the Louisiana Revised Statutes. In accordance with R.S. 38:2212(8)(1), the provisions and requirements stated in the bidding documents shall not be considered as informalities and shall not be waived. The successful Bidder shall be required to furnish a Performance Bond and Payment Bond, in an amount equal to 100% of the Contract amount, written by a surety or insurance company meeting the requirements noted in R.S. 38:2219.A.( l )(a), (b) and (c). Each Bidder must deposit with his/her bid, security in the amount of at least five percent (5%) of the total bid price, provided on the specified form and subject to the conditions provided in the Information for Bidders. Sureties used for obtaining bonds must appear as acceptable on the U.S. Department of the Treasury Circular 570. Bidder shall show the Contractor's license number and name of the project on the Bid envelope as required by Louisiana Revised Statutes 37:2163.A.(l ). In accordance with in R.S. 38:2215. A., no Bidder may withdraw his bid within forty-five (45) days after the actual date of the opening. Any person with disabilities requiring special accommodations must contact the Owner no later than seven (7) days prior to bid opening. The project consists of (but is not limited to) the following scope of work: 1. Enhancing the indoor air quality for the school by means of upgrading the ventilation, cleaning evaporator coils and increasing filtration capabilities. 2. Increase filter efficiencies. 3. Add motorized dampers to existing units in the Gym and Admin. Buildings. 4. Add bipolar ionization to the existing air handling units, gas furnace units, DOAS units and rooftop A/C units throughout the school campus. 5. Desigo Migration Scope of Work: a. Ensure that all Area Level Controllers (PXC controllers) have the most up to date firmware revisions. Area Level Controllers that are obsolete and can no longer accept firmware revisions will be replaced (Fast Forwarded) with their up-to-date hardware counterpart (Apogee PXC Controller). Graphics will be transferred from the existing Apogee Insight system to the new Apogee Desigo System. Trends and Scheduled data will transferred over to the new Apogee Desigo System from the original system. The New Apogee Desigo Front End will be added to a Windows 10 Computer and will reside the Rapides Parish School Board Maintenance office. 6. Building Management System upgrade general scope of work: a. Add firmware updates to all Siemens Apogee PXC Panels. Replace any obsolete panels that can no longer receive firmware updates. These will be replaced with Apogee PXC Panels. New Apogee Panel will be added and installed in Building B. Through this new panel, Integrate to the Existing DOAS Units in building B and integrate to the new BACNet thermostats that will be provided and installed by the control's contractor. All split systems will have BACNet thermostats provided and installed by controls contractor. BACNet Thermostats will allow for temperature sensing, humidity sensing, and start/stop control over the split systems. Humidity Sensors will be added in each building and will be connected to the nearest Area Level Controller. Conduit that is run above ground will be covered by the controls contractor. Any trenching and underground conduit will be covered by the Contractor.

Award

Educational

$229,600.00

Public - County

Renovation

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
50
Bidding Soon
634
All Active Projects
350
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 14, 2022

November 14, 2022

May 13, 2023

img_map_placeholder

10935 LA-112, Glenmora, LA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.