Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published October 19, 2022 at 8:00 PM
Updated October 1, 2024
Site work and new construction of a mixed-use development in Miami, Oklahoma. Completed plans call for the construction of a pre-engineered storage facility; for site work for a pre-engineered storage facility; water / sewer project; and water / sewer project.
Staff will evaluate responses and present a recommendation to the City Council for consideration and approval at a properly scheduled meeting of the governing body. DRAWING AND CONSTRUCTION OF SLUDGE STORAGE BUILDING SMALL BUSINESSES AND MINORITY BUSINESSES ARE ENCOURAGED TO BID BID ENVELOPES SHALL BE CLEARLY MARKED "SEALED BID" WITH THE BIDDER'S N A M E & A P P R O P R I AT E SOLICITATION NUMBER (C22- 45) CLEARLY SHOWN ON FRONT OF THE ENVELOPE. The City reserves the right to reject any and all bids and to award more than one contract. Any bid received after the time set for the opening of bids, shall not be considered by the awarding agency, and shall be returned unopened to the bidder submitting same. The Miami Special Utility Authority is seeking a contractor to submit drawings and construction costs to build a sludge drying and storage building per the specifications below. o 40' X 30' Building o 60" wide by 36" deep 3000 PSI concrete Footing reinforced with (10) #4 rebar continuous. o 6" Slab with 3500 PSI concrete, reinforced with #4 Rebar on 24" centers over 4" of compacted rock. o Open on one 30' side o 12' X 12" 3500 PSI Concrete Walls on 3 sides, reinforced with #4 rebar on 12" centers each way. o 4' of overhang on open end. o All Metal Gabled Roof. This project is to be bid total and complete and Contractor will be satisfied of project expectations before a bid is submitted. Though the MSUA is seeking a total price bid, bidders must submit a listing of materials, to include quantities, with the bid submission. Construction will not begin until drawings have been reviewed by staff, approved by the MSUA, and a Notice to Proceed has been signed by all parties. All work performed shall be inspected by the project manager. Materials and workmanship shall be tested on a random basis by the contractor, project manager and/or MSUA engineer. Near the end of the project, a walk through will be conducted with onsite inspector(s) to develop a punch list of remaining items to complete.
Award
Warehouse / Distribution - Pre-Engineered Storage Building
$114,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 31, 2022
September 30, 2022

Multiple Locations, Miami, OK
Related To This Project
Miami, OK
Bid Date: Nov 14 2022
Miami, OK
Bid Date: Oct 17 2022
Miami, OK
Bid Date: Nov 01 2022
Miami, OK
Bid Date: Oct 07 2022
Miami, OK
--
Miami, OK
Bid Date: Oct 06 2022
Miami, OK
--
Miami, OK
Bid Date: Sep 22 2022
Miami, OK
Bid Date: Nov 22 2022
Muldrow, OK
Bid Date: Oct 19 2022
Tahlequah, OK
Bid Date: Oct 19 2022
Tulsa, OK
Bid Date: Aug 23 2022
Oklahoma City, OK
Bid Date: Oct 24 2022
Tahlequah, OK
Bid Date: Oct 31 2022
Oklahoma City, OK
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.