BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 14, 2022 at 8:00 PM

Updated September 15, 2023

Site work and new construction of a mixed-use development in East Carbon, Utah. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Description of Work: The work involves the construction of a new package water treatment plant adjacent to the existing treatment plant building at the East Carbon Water Treatment Plant. The construction shall include the installation of steel building, a 50,000 gallon concrete water storage tank, interconnecting piping, treatment plant equipment, and electrical work. The steel building, treatment plant equipment, other accessory equipment, pumps, electrical generators shall be provided by the Owner and installed by the Contractor. Installation of the building and equipment shall include unloading, storing, and protecting the equipment. Major items of work include: 1. Metal Building Erection & Interior Framing and Finishing (100' X 55') 2. Equipment assembly & Installation including package water treatment units, electrical generator, chlorine equipment & etc. 3. Piping and Plumbing 4. Structural Reinforced Concrete 5. 50,000 Gallon Concrete Storage Tank 6. Metal Grating and Platforms. 7. Electrical

Award

Water / Sewer

$4,000,000.00

Public - City

New Construction, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2022

November 7, 2022

Project location map

101 W Geneva Dr, East Carbon, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.