BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Morganfield, Kentucky. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

This document constitutes a Request for Proposals for a Professional Service Contract from qualified individuals and organizations to furnish those services as described herein for the Commonwealth of Kentucky, Department of Highways. Project Manager - Larry Krueger, P.E. User Division - Highway Design Approximate Fee - $650,000 Preliminary Engineering & Environmental Services (Lump Sum) Project Funding - Federal Funds (STP2) Project Length - Approximately 3.09 miles The purpose of this project is to improve safety, traffic flow, and function of US-60. This section of US-60 is a major connection between Sturgis and Morganfield. It provides access to a high school, a middle school and the county hospital. This section has very little shoulders, a few geometric deficiencies, and undesirable intersection layouts. This project is needed to provide a safe and reliable route for those accessing services within the corridor as well as residential and commercial traffic traveling to Morganfield. In addition, this section of US-60 is part of the truck network in Union County that is vital to businesses The Consultant team shall include a DBE Participation Plan with their Response to Announcement to help the Department meet the 11.95% DBE goal established by FHWA. The plan should demonstrate how DBE companies will be mentored or used to assist in the area(s) pertaining to this contract. If included, an additional page will be allowed in the Project Approach (Section 7) to exhibit this plan. A maximum of four (4) points will be considered in the Evaluation Factors for the DBE Participation Plan First Selection Meeting: September 2, 2022 Final Selection: September 21, 2022 Pre-Design Conference: September 28, 2022 Consultant Fee Proposal: October 7, 2022 Contract Negotiations: October 19, 2022 The method of contractor selection has not been determined at this time.

Conceptual

Roads / Highways

$300,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
27
Bidding Soon
389
All Active Projects
204
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2023

img_map_placeholder

US - 60, Morganfield, KY


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.