Site work for a water / sewer project in St. John's, Newfoundland. Completed plans call for site work for a water / sewer project.

Closing Time: 2:00 PM (NT) **Please note that there has been 1 addendum issued for this project.** This is the first phase (Phase One) of a two-phase process: the first phase will evaluate the qualifications of all interested suppliers; the second phase (Phase Two) will invite the qualified suppliers to provide a financial bid on the project based on the specifications and drawings. The qualification list will expire within 60 days or upon award of a contract in Phase Two, whichever is earlier, and the prequalification list will not be used in any other solicitation. The work under this project consists of the furnishing of all plant, labour, equipment and material to perform the work. In general, work under this contract will consist of, but will not necessarily be limited to, the following: 1. Trim overhanging vegetation, as required, along the main park access road, for equipment access to site. 2. Demolish and remove existing pipe railing on staircase. 3. Construct temporary access route to fishway for accessing upstream riverbank and control structures. This includes backfilling the existing staircase, using a portion of the existing trail, and extending a temporary road, off existing trail, along the back of the fishway. 4. Construct and maintain temporary dewatering devices and structures. 5. Remove and dispose of existing bottom debris required to construct and install the new weir wall, stop log sill, control structures, and division wall. This includes but is not limited to, river deposited rock materials (such as boulders, cobbles, and other sediments), organics, vegetation, garbage, sandbags, and any other existing temporary devices/structures or debris that interferes with the new work. 6. Demolish and remove damaged sections of existing water control structures, as directed by the Departmental Representative. 7. Demolish and remove existing downstream diversion wall. 8. Excavate rock and prepare base for new water control structures and new diversion wall. 9. Drill and grout rock anchors for new concrete control structures and diversion wall. 10. Construct two (2) new reinforced concrete control structures with stop log guides and embedded pipe sleeves for counting fence installation. 11. Construct new reinforced concrete diversion wall. 12. Remove existing stop logs at upstream fishway pool location and replace existing concrete sill complete with new metal stop log sill plate. Reinstall stop logs upon completion of work. 13. Remove existing damaged fishway weir wall and replace with new. 14. Remove all temporary dewatering structures once in-water work is complete. 15. Remove temporary access road to fishway and reinstate with new rip-rap scour protection, rock fill, and gravel fill installed along the back of the fishway. 16. Remove loose or damaged sections of concrete along the existing staircase and landing areas. 17. Resurface staircase with a new reinforced concrete topping. 18. Install new, removable galvanized railing. 19. Place new fill material over trail area to blend into new staircase approaches to approval of the Departmental representative. 20. Clean-up site and demobilize. Contractors, bidders or those they invite to site are to take all appropriate safety measures for any visit to site, either before or after acceptance of bid. The estimated value for this opportunity is in the range of $500,001 to $1,000,000. Bid Security will be a requirement for this tender during Phase Two. Delivery Date Required: 44 weeks after award of contract. The Crown retains the right to negotiate with suppliers on any procurement. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.

Post-Bid

Water / Sewer

$1,000,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
9
Bidding Soon
116
All Active Projects
57
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2022

September 26, 2022

img_map_placeholder

Multiple Locations, St. John's, NL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.