Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 22, 2022 at 8:00 PM
Updated September 15, 2023
Site work and new construction of a mixed-use development in Moorefield, West Virginia. Completed plans call for the construction of a 6,000-square-foot, one-story above grade municipal facility; for site work for a municipal facility; pre-engineered storage facility; and pre-engineered storage facility.
Construction will include site development and a new building to provide administrative space and a garage facility for equipment. The single story, 6,000 SF structure will be comprised of concrete masonry units and pre-engineered metal building components with structural metal stud infill at the exterior of the office portion of the building. The roof will be ribbed metal panels per the metal building manufacturer. Exterior cladding of the office portion of the building will be split face CMU veneer and ribbed metal panels for the garage portion. The exterior doors will be galvanized hollow metal doors and frames and the interior doors will be primarily hollow metal frames with solid core wood doors. Interior partitions will be nonloadbearing metal studs and drywall. Finishes will include painted drywall, carpet tile, and LVT. Ceilings will be acoustic lay-in ceilings. The building will include electrical and data systems, lighting, plumbing and HVAC systems. There is also an alternate for using CMU bearing walls and steel joists in lieu of PEMB. Bidding Documents may be purchased from the Issuing Office during the hours indicated above. Cost does not include shipping charges. Upon Issuing Office's receipt of payment, printed Bidding Documents or electronic documents will be transmitted to the prospective Bidder. The shipping charge amount will depend on the shipping method requested.
Award
Municipal
$2,012,100.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 20, 2022
November 21, 2022
102 N Main St, Moorefield, WV
Related To This Project
Moorefield, WV
Bid Date: Oct 04 2022
Moorefield, WV
Bid Date: Mar 14 2023
Moorefield, WV
Bid Date: Jun 01 2023
Moorefield, WV
Bid Date: Jul 18 2023
Moorefield, WV
Bid Date: Sep 22 2023
Moorefield, WV
Bid Date: Dec 07 2021
Moorefield, WV
Bid Date: Jan 20 2022
Moorefield, WV
Bid Date: Mar 03 2022
Moorefield, WV
Bid Date: Aug 10 2022
Moorefield, WV
Bid Date: Jun 28 2022
Moorefield, WV
Bid Date: May 10 2019
Moorefield, WV
Bid Date: May 17 2022
Moorefield, WV
Bid Date: May 17 2022
Moorefield, WV
Bid Date: Apr 27 2022
Moorefield, WV
Bid Date: May 11 2021
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed