BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Detroit, Michigan. Design plans call for site work for a water / sewer project.

As of October 17, 2023, an engineer has been selected for the project. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: Depending on the project location, individuals may be required to wear masks to attend meetings and for a firm to be eligible to submit bids / quotations / proposals. Bring and be prepared to wear a mask if required upon arrival. Requirements may change at any time and any updated guidance must be followed. The Michigan Department of Transportation (MDOT) in partnering with the Department of Technology, Management and Budget (DTMB) is seeking the services of a professional engineer to provide design and construction management services to address the combined storm - sanitary sewer system backflow issue at the MDOT Detroit Garage. During heavy rain conditions, the floor area of the MDOT cold storage building (32,000 SF + / -) becomes flooded and creates a potential safety hazard. See attached photo(s) for the severity of the building floor flooding. The combined storm - sanitary sewer system locate don-site is to be redesigned as needed to accommodate a 100-year storm and to eliminate all backflow and flooding issues. A detention pond most likely will be needed to provide an acceptable influent rate to the City of Detroit combined storm - sanitary sewer system. Active communication with the City of Detroit will be expected to produce a final solution. In 2003, an Environmental Site Assessment (ESA) Phase I was performed and indicated potential on-site soil and groundwater contamination. Therefore, ESA Phase II is required due to future construction activities. The attached documentation includes but is not limited to: Corby Energy (and Spicer Group) Stormwater Drainage Report and related items (survey information, storm sewer cleaning and videoing information, calculations, etc.), Environmental Site Assessment (ESA) Phase I will be made available to the selected professional to use at their own discretion for the project. Phases - Deliverables: Combine Phases 100 through 500 as you see fit. Provide complete calculation at the end of Phase 500. Design Meetings: o Kickoff First Meeting - At Site o 30% - First Deliverable with Cost Estimates. Meeting will be online using Microsoft TEAMS o 75% - Second Deliverable with Cost Estimates. Meeting will be online using Microsoft TEAMS o 95% - Third Deliverable with Cost Estimates. Meeting will be online using Microsoft TEAMS o 100% - The final meeting deals with specifications and front-end bidding documents. Plan on at least two (2) hours for this call. Allocate $20,000.00 for communications with the City of Detroit. This allowance is also to cover the cost to be paid to the City of Detroit to jackhammer concrete in MH 1105. Each proposer to present their own work schedule. For bidding and contracting, assume three (3) months from the time plans and specifications are 100% complete to the time when the Pre-Construction meeting is held. Please do not submit online questions via VSS. ALL questions should be emailed to Chris Bahjet at bahjetc@michigan.gov address no later than 2:00 p.m., Eastern on Tuesday, September 6, 2022. The method of contractor selection has not been determined at this time

Design

Water / Sewer

$500,000.00

Public - State/Provincial

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
331
Active Projects
192
Bidding Soon
2,733
All Active Projects
1,115
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 23, 2024

img_map_placeholder

1500 E Ferry St, Detroit, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.