Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a playground / park / athletic field in Colton, California. Completed plans call for site work for a playground / park / athletic field.
To bid on this Project, the Bidder is required to be registered as a public works contractor with the Department of Industrial Relations and to possess one or more of the following State of California Contractor Licenses: C-61 and a certified playworld play equipment installer. The Bidder's license(s) must remain active and in good standing throughout the term of the Contract. The Project consists of all labor, materials equipment and services necessary to install the district provided playground parts The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Work. The successful Bidder may substitute securities for any monies withheld by the District to ensure performance under the Contract, in accordance with the provisions of section 22300 of the Public Contract Code. The successful Bidder shall comply with all requirements of Division 2, Part 7, Chapter 1, of the Labor Code and Title 8 of the California Code of Regulations. For all work performed pursuant to this Contract, the Contractor and all subcontractors shall pay all workers not less than the general prevailing rate of per diem wages and for holiday and overtime work as determined by the Director of the Department of Industrial Relations, State of California, ("DIR") for the type of work performed and the locality in which the work is to be performed within the boundaries of the District, pursuant to sections 1770 et seq. of the California Labor Code. The Bidder and all Subcontractors under the Bidder shall comply with applicable federal, State, and local requirements relating to COVID-19 or other public health emergency/epidemic/pandemic including, if required, preparing, posting, and implementing a Social Distancing Protocol. The Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening. Time for Completion : District may issue a Notice to Proceed within sixty (60) days from the date of the Notice of Award. Once Contractor has received the Notice to Proceed, Contractor shall complete the Work within the period of time indicated in the Contract Documents. All questions about the meaning or intent of the Contract Documents are to be directed via email to the District to Purchasing Director at joann_baeza@cjsud.net, Subject Title: Bid 23-01 JB Playground Replacement Parts Installation Project .Questions must be received by August 17, 2022 at 2:00 p.m. , questions received after this time may not be answered. Only questions answered by formal written Addenda will be binding
Award
Playgrounds / Parks / Athletic Fields
$74,475.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 25, 2022
September 1, 2022
To Be Determined, Colton, CA
Related To This Project
Colton, CA
Bid Date: Nov 03 2022
Colton, CA
Bid Date: Sep 08 2022
Colton, CA
Bid Date: Jun 22 2023
Colton, CA
Bid Date: Nov 03 2022
Colton, CA
--
Colton, CA
Bid Date: Dec 20 2022
Colton, CA
Bid Date: Mar 08 2022
Colton, CA
Bid Date: Mar 17 2022
Colton, CA
Bid Date: Oct 27 2022
Colton, CA
Bid Date: Oct 13 2022
Colton, CA
Bid Date: Nov 10 2022
Colton, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.