BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2022 at 8:00 PM

Updated September 15, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Fremont, Nebraska. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The work shall include all labor, materials, transportation, and equipment required for abutment reconstruction, installation of new grade beams, new approach pavement, and new approach guardrail at both ends of the bridge. Proposals must be submitted on the forms furnished with the Bid Documents. PLEASE ONLY SUBMIT DIVISION 5. Each bidder will be required to submit with his proposal a Bid Bond or Certified Check made payable, without condition, to the County Treasurer of Dodges County, Nebraska, in an amount equal to five (5) percent of his proposal. The bidder to whom the contract is awarded shall furnish within ten (10) days after the award a surety bond or bonds in a sum equal to the full amount of the contract. The form of the bonds and surety shall be acceptable to the Dodges County Board of Supervisors. The bidder will include an estimated time of beginning and completion for the project with the proposal. The Contractor will be allowed 60 calendar days for completion of the site. The Contractor may begin work after October 17, 2022. The required completion date of the project is June 30, 2023. Dodges County is an Equal Opportunity Employer. Awarding of the Contract will be in accordance with the eleven points enumerated under "Competitive Bidding; Consideration", COUNTY PURCHASING ACT, N.R.S. Sections 23-3101 through 23-3114 and any competitive bidding requirements of Nebraska Statutes 16-321, et. seq., and the Dodges County Board of Supervisors will, at their discretion, award based on the lowest or best bid. The Board of County Supervisors reserves the right to reject any and all bids or to waive any irregularities in bids.

Award

Bridges / Tunnels

$349,532.00

Public - County

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
92
Bidding Soon
967
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2022

October 17, 2022

Project location map

To Be Determined, Fremont, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.