BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a fitness / recreation center in Temecula, California. Completed plans call for the renovation of a fitness / recreation center.

Riverside County, and City of Temecula statutes, regulations, orders, and ordinances. This requirement specifically includes, without limitation, compliance with the "Safety and Health Guidance COVID-19 Infection Prevention in Construction" issued by the California Department of Industrial Relations, Division of Occupational Safety and Health and Safety on July 20, 2020 and as may be amended from time to time by the Department, relating to mitigating the transmission of COVID-19 on the project site and mitigating the transmission of COVID-19 by employees or workers of Contractor and its subcontractors in their contacts with City employees and consultants. Prior to the pre-construction meeting, the Contractor shall submit to the City a "COVID-19 Mitigation Program" implementing these requirements and shall post the COVID-19 Mitigation Program on the project site in a manner designated by the City's Project Manager. The failure of employees or workers of the Contractor and all subcontractors on the Work to comply with these requirements shall be a default per Section 6-7.1. Contractor acknowledges that, in the event that the Engineer suspends the Work as a result of such failure by Contractor or one of its subcontractors to comply with these requirements, City is not responsible for the delay, and the Contractor is not entitled to compensation pursuant to Section 6-4.3. The Contractor shall also pay to the City the costs and expenses incurred by the City resulting from the failure of employees of the Contractor and all subcontractors on the Work to comply with these requirements including, but not limited to, the salaries and benefits for City employees who are unable to work, and workers compensation benefits and expenses. Delays in the Work resulting from Contractor's or its subcontractor's failure to comply with these regulations shall not be considered an unforeseen event entitling Contractor to an extension of time or payment for delay pursuant to Section 6-4 of the Standard Specifications. Documents must be uploaded in PDF format. It is the Bidder's responsibility to ensure their bid documents are properly uploaded onto the City's online bid management system . Bids that are missing pages, cannot be opened, etc. may be considered unresponsive. Hard copies submitted to the City, in lieu of an electronic copies uploaded onto the system, will not be accepted as a viable bid. It is the bidders sole responsibility to contact the City's online bid management provider (PlanetBids at 818-992-1771) to resolve any technical issues related to electronic bidding, including (but not limited to) registering as a vendor, updating passwords, updating profiles, uploading/downloading documents, submitting an electronic bid, etc. Protest Procedures: Pursuant to Chapters 3.28.350 and 3.32.060 of the City of Temecula Municipal Code, any actual or prospective bidder, proposer, or contractor (collectively "bidder") who believes he or she has been aggrieved in connection with the solicitation or award of a contract pursuant to this Chapter may protest, in writing, to the Office of the City Clerk, within three (3) business days after posting of the award recommendation at the location where bids or proposals are submitted. Protest Procedures (Continued): Said bidder shall refer to Chapter 3.28.350 and 3.32.060 of the Temecula Municipal Code for detailed filing requirements. The City's municipal code can also be accessed online at website. SB854: No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5. No Contractor or subcontractor may be awarded a contract for public work unless registered with the DIR pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring & enforcement by the DIR. Online Q&A Yes Q&A Deadline 08/25/2022 5:00 PM (PDT) License Requirements Class B Liquidated Damages $1,000 per calendar day Response Format Electronic Project Type Bid Response Types Line Items Bid Bond Proposal (See Notice Inviting Bids) (required) Type of Award Lump Sum The Engineer's estimate for the proposed project is $3,400,000.00. Work includes renovation of the building interior including safety features, concrete slab, flooring, roof, and restroom facility access; ADA compliance; renovation and expansion of existing office space and recreation rooms, sitework including concrete and AC paving, and any other work required by the plans and specifications. Project No. 13020.001

Award

Fitness / Rec Centers

$3,568,395.00

Public - City

Renovation

Subscribe For Documents

94 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
91
Bidding Soon
1,892
All Active Projects
868
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2022

October 17, 2022

img_map_placeholder

30875 Rancho Vista Rd, Temecula, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.