BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Licking, Missouri. Conceptual plans call for site work for a water / sewer project.

As of March 17, 2023, a design team has not been selected as funding fell through. Funding is being sought again. *The previous closed solicitation is listed below for reference. Public Water Supply District #4 of Texas County, Missouri, is requesting qualifications for engineering services to improve the district's water system. The engineering services required may include planning, design, and/or construction oversight of the project. Facility plans and engineering reports should adhere to 10 CSR 20-8.1 10 Engineering - Reports, Plans, and Specifications. Funding for the project is through the Missouri Department of Natural Resources' Financial Assistance Center. Qualification information provided to the District shall include: The specialized experience and technical competence of the firm with respect to the type of services required (15 points) The capacity and capability of the firm to perform the work in question, including specialized services, within the time limitations fixed for the completion of the project (25 points) The past record of performance of the firm with respect to such factors as control of costs, quality of work, and ability to meet schedules (15 points) The firm's proximity to and familiarity with the area in which the project is located (20 points) The firm's professional experience in designing water systems (25 points) Selection Process: Once the District selects the most qualified firm based on the above qualification evaluation, an engineering agreement will be negotiated. The engineering agreement may include services other than planning, design, and/or construction management including, but not limited to, assistance with securing project financing, assistance with attaining easements or real property, user rate analysis, geotechnical analysis, surveying, or other services as needed. The method of contractor selection has not been determined at this time.

Project Abandoned

Water / Sewer

$600,000.00

Public - County

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
17
Bidding Soon
249
All Active Projects
82
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2023

img_map_placeholder

Multiple Locations, Licking, MO

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.