Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Huntington, New York. Contact the soliciting agency for additional information.
A proposal submitted by a bidder who is not in full compliance with the provisions of the Huntington Town Code at the time of submission will be denied. No Change in Specifications Allowed: The BIDDER shall not make any changes in the Specifications. BIDDERS, however, may make any explanations they wish in blank space below Specifications or by memorandum attached to proposal, or by letter attached. No alterations, erasures or additions are to be made in the typewritten matter. Discrepancies: Should the BIDDER find discrepancies in, or omissions from the Contract Documents, or should he be in doubt as to their meaning, he should notify the DIRECTOR who may send a written instruction to all BIDDERS. No oral interpretations shall be made to any BIDDER as to the meaning of any of the Contract Documents. Every request for interpretations shall be in writing to the DIRECTOR. Questions During the Bidding Period: Questions, requests for information or interpretations concerning the drawings or specifications, or any aspect of the project must be addressed in writing to the DIRECTOR OF PURCHASING, TOWN OF HUNTINGTON, Town Hall, 100 Main Street, Room 209, Huntington, New York 11743, Fax # (631) 351-2833 or email at purchasing@huntingtonny.gov and to be given any consideration, must be received at least five (5) business days prior to the date fixed for the opening of bids. Deposits: Bid Security: Each bid must be accompanied by a bid bond or certified check of the BIDDER payable to the TOWN OF HUNTINGTON in an amount not less than five percent (5%) of the amount of the TOTAL BID PRICE. Checks or bid bonds will be returned to all except to the three lowest formal bidders within ten (10) days after the formal opening of bids. Upon the award of the Contract to the accepted bidder, the checks or bid bonds will be returned to the remaining two bidders. Required Bonds: The successful bidder shall furnish the OWNER at the time of signing the Contract the following bonds: (a) Faithful Performance Bond - (See Page 44) (b) Labor and Material Bond - (See Page 44) Upon completion of the work, a Maintenance Bond shall be furnished to the OWNER. Method of Award: The right is reserved to waive any informalities in, to reject any or all bids submitted, or to accept the bid and award the Contract to the lowest responsible bidder, therefore pursuant to Section 102 of the General Municipal Law. The right is reserved to waive any informalities in, to reject any or all Bids submitted, or to accept the Bid and award the Contract to the lowest, responsible, formal Bidder therefore, pursuant to Section 103 of the General Municipal Law
Post-Bid
Municipal
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2022
October 3, 2022
Multiple Locations, Huntington, NY
Related To This Project
Huntington, NY
Bid Date: Sep 08 2022
Huntington, NY
Bid Date: Sep 15 2022
Huntington, NY
Bid Date: Sep 15 2022
Huntington, NY
Bid Date: Sep 15 2022
Huntington, NY
Bid Date: Sep 22 2022
Huntington, NY
Bid Date: Sep 29 2022
Huntington, NY
Bid Date: Aug 25 2020
Huntington, NY
Bid Date: Jan 26 2023
Huntington, NY
Bid Date: Jan 11 2022
Huntington, NY
Bid Date: Jul 26 2022
Huntington, NY
Bid Date: Aug 17 2023
Huntington, NY
Bid Date: Aug 18 2022
Huntington, NY
Bid Date: Jul 28 2022
Huntington, NY
Bid Date: Jul 28 2022
Huntington, NY
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction leads in the industry. Period.
Get instant access to five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.