BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Milwaukee, Wisconsin. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

This project includes a 2" mill and replacement or full depth reconstruction of approximately 45,000 square yard of airfield and support pavement on the tower apron, north hangar apron areas, perimeter roadway, and other miscellaneous paved areas at Milwaukee County's Timmerman Airport. Also included are areas of pavement removal (convert to turf), new pavement in turf areas, joint sealing, pavement marking, and turf repair. Project to be substantially complete on June 28th 2023 and within 47 calendar days including 5 non-working days for poor weather over that time. For Federally Funded Contracts wage rates are established pursuant to Federal Labor Determination and Provisions Disadvantaged Business Enterprise (DBE) participation goal for this Project is 18 percent. To Be Considered for This Project All Required Dbe-14 Forms Shall Be Completed and Signed by Prime and Submitted as Indicated in Invitation to Bid. Bidders shall submit the completed Subcontractor-Supplier Information Entry with the Bid. Failure to submit this information with Bid may result in rejection of the Bid as non-responsive. A 10 percent bid bond or certified check is required with bid. The low responsive, responsible bidder will be recommended for contract award. Owner reserves right to reject bid, to waive informalities in bid or to accept bid which will be in best interest of Owner. Base Bid shall remain open to acceptance for a period of 60 days after bid due date.

Bid Results

Transportation Terminals

$774,148.00

Public - County

Paving, Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
48
Bidding Soon
1,075
All Active Projects
468
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2022

October 3, 2022

img_map_placeholder

9305 W Appleton Ave, Milwaukee, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.