BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a pre-engineered storage facility in Attleboro, Massachusetts. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Project cost is estimated to be under $25,000. The City of Attleboro is requesting quotes (RFQ) to provide new 10' x 20' Colonial Style Shed & installed on existing concrete pad installed at 29 Pond St No, Attleboro, MA. Provide & Install 10' x 20' Colonial Style WOOD Shed installed on existing concrete pad (no flooring) 1. Vinyl siding (Clay color or compatible) 2. Architectural roof shingles (charcoal color or compatible) 3. 5/8" x 1 0' white metal flashing 4. 7' steel roll-up door with pvc trim and 1/2 " J-channel on right gable end 5. 3'0" x 6'-8" 6-panel steel door R.H. in swing, vinyl brick molding, wood jams and bored for deadbolt. 6. 4-9/16" x 6' pre-hung sill pan 7. Deadbolt lock for pre-hung door (satin nickel) 8. 2-I 8"x27" }-Standard windows ( on either side of front entry door) 9. Black vinyl shutters for both windows 10. PVC bottom and comer trim 11. Workers Compensation, General Liability, Builder's Risk, and other such insurances as required by law will be carried from the beginning to the completion of project. 12. All OSHA safety standards to be maintained throughout the entire project. 13. Contractor shall be responsible for supplying all labor and materials, scaffolding and or aerial lifts to perform the work. Contractor shall be responsible for leaving site clean and neat at the end of each workday. 14. Any obstructions such as branches will be cut away by City of Attleboro employees only 15. Contractor shall complete project within 30 days from notice to proceed 16. Work is to be done Monday thru Friday. 17. Remove trash, debris, equipment from project site and surrounding areas. 18. The Successful contractor who enters into a Contract with the City shall be responsible for obtaining at his/her/its own expense, all appropriate federal, state and local permits, licenses and approvals

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$20,352.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
316
Active Projects
158
Bidding Soon
2,934
All Active Projects
1,251
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2022

September 30, 2022

img_map_placeholder

29 Pond St N, Attleboro, MA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.