BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 15, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a bridge / tunnel in Westville, Florida. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of February 15, 2023, information regarding the award and award date has not been disclosed. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 03 Selection Method : Letter of Response and Abbreviated Technical Proposal Financial Management Numbers : 44294013201 Design CR 65 Roping Rd in Holmes Co. (Bridge No. 524178) TRC Members (Subject to Change) : Patrick Roark Ryan Adams Wesley Chevillot Shortlist Selection Date/Time 9/19/2022 07:30 pm Phase II Submittal Deadline Date/Time 10/10/2022 10:30 pm Final Selection Date/Time 10/31/2022 07:30 pm Negotiations Period Begin Date 11/15/2022 Negotiations Period Ending Date 12/28/2022 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - Design CR 65 Roping Rd in Holmes Co. (Bridge No. 524178)

Conceptual

Bridges / Tunnels

$1,361,346.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
44
Bidding Soon
578
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2023

Project location map

CR 65, Westville, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.