BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a stadium in Hagerstown, Maryland. Completed plans call for the construction of a stadium; and for site work for a stadium.

Turner Construction Company is soliciting bids for GMP#2 trade packages related to the Hagerstown Multi-Use Sports and Events Facility project. MBE Participation (%) 29.0 African American MBE Participation (%) 8.0 Women-Owned MBE Participation (%) 11.0 The Hagerstown Multi-Use Sports and Events Facility will be a state of the art, family-friendly venue with flexibility to include the hosting of outdoor concerts, festivals, community, and family-oriented events, as well as serving as the home field for an Atlantic League Professional Baseball Club. Additionally, the facility will be designed to host other sports, cultural, and community events. The project will include demolition of existing buildings located on the site, site enabling work, and construction of the new facility, inclusive of structure, turf, seating, The facility will be a catalyst for downtown revitalization and inspire further economic development and tourism for Washington County and western Maryland. The tentative constructions start, and completion date is September 2022 through April 2024. RFI Due Date: August 24, 2022 at 2PM Scope Review Meetings w/ Trade Partners: September 12 to September 15, 2022 Anticipated Trade Partners Awards Notifications: 1st and 2nd week of October 2022 All MBE and Non-MBE firms are encouraged to attend. MBE firms MUST be MDOT certified. All bids shall not include onsite General Liability and Workmen's Compensation. This project will be a CCIP project. All bids shall exclude Payment and Performance Bonds. Please provide an ADD/Alternate price for P&P Bonds in the space provided on the Bid Form. The successful Bidder shall participate in the Turner Subcontractor Substance Abuse Program for all on-site personnel. Each individual that will be working on-site is required to successfully pass the drug test before beginning work. Please refer to the Turner Safety Program for more information. Subcontractor selection will be finalized using the following process: 1. Turner will review and analyze the written bid proposals submitted in response to the Invitation to Bid and supporting documentation. 2. Following, Turner will schedule an interview, at Turner's main office, with the responsible proposers that best meet the objectives and criteria for ultimate selection. Each subcontractor should be represented by company officials and those who prepared the bid proposal. 3. Each subcontractor who submitted a bid proposal and participated in the interview process will be contacted and advised of the award decision. Questions during bidding shall be submitted in writing on your letterhead by e-mail to Turner Construction Company, Attn: Mark McAbee at mmcabee@tcco.com no later than August 24, 2022 no later than 2:00PM. The design team has been advised that all questions must be addressed through Turner, and no individual questions will be responded to except through the proper channels. Turner reserves the right to reject any and all bids. In considering whether a bidder is responsive, Turner will consider the bidder's quality of work, general reputation in the community, diversity participation, financial responsibility, safety record, bidder's understanding, and ability to complete the intent of the documents, and similar project experience. The project value listed reflects the total project estimate

Post-Bid

Arenas / Stadiums

$3,306,244.00

Public - State/Provincial

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
86
Bidding Soon
1,812
All Active Projects
741
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2022

October 21, 2022

img_map_placeholder

100 Summit Ave, Hagerstown, MD

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.