BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Moab, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Award Details Contract Award Date: Sep 24, 2022 Contract Award Number: 140L5722P0056 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: R4APEVF6PJV3 Contractor Awarded Name: HARRISON OILFIELD SERVICES, INC. Contractor Awarded Address: Moab, UT 84532-3668 USA Base and All Options Value (Total Contract Value): $78874.1 Poison Spider Trailhead Access Road Rehabilitation Period of Performance: 10/01/2022 to 02/28/2023 Rehabilitate Trailhead Access Road (GAOA Funds - LXOAL0840000 GAOA - Funded project FY21 00010 Poison Spider Trailhead Access Road Rehabilitation in accordance with attached specifications, drawings, clauses, and wage determination Product/Service Code: Z1LB Product/Service Description: MAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS Delivery: 90 Days After Notice to Proceed Type of Contract: Construction, Firm Fixed Priced (FFP), Single Award Contract County: Grand County, UT Type of Construction: Highway Magnitude: $100,000 - $250,000 NAICS: 2237310 SIZE STD: $39.5M SET-ASIDE: Small Business Site Visit: A site visit will be held on August 29, 2022 at 2:00 pm MT, meet at the project site. Attendance is highly encouraged. Please follow the current CDC's social distancing guidelines during the site visit. RSVP site visit attendance to Stan Johnson sjjohnson@blm.gov. Questions Due Date: Due September 02, 2022 12:00 pm MT by email: tbluntmayes@blm.gov. Quote Submittal Information: Due September 14, 2022 12:00 MT pm by email: tbluntmayes@blm.gov See Section L for quote submittal requirements Period of Performance: 90 calendar days from Notice to Proceed (NTP). Issuance of NTP will be done at time of award. (Estimated performance period to be October - February) Award Selection Process: As described in Section M Bonds: Bid bond is required. Performance and Payment bond required 10 days after award of contract *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Poison Spider Trailhead Access Road Rehabilitation Period of Performance: 10/01/2022 to 02/28/2023 Rehabilitate Trailhead Access Road (GAOA Funds - LXOAL0840000 GAOA - Funded project FY21 00010 Poison Spider Trailhead Access Road Rehabilitation in accordance with attached specifications, drawings, clauses, and wage determination Product/Service Code: Z1LB Product/Service Description: MAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS Delivery: 90 Days After Notice to Proceed Type of Contract: Construction, Firm Fixed Priced (FFP), Single Award Contract County: Grand County, UT Type of Construction: Highway Magnitude: $100,000 - $250,000 NAICS: 2237310 SIZE STD: $39.5M SET-ASIDE: Small Business Site Visit: A site visit will be held on August 29, 2022 at 2:00 pm MT, meet at the project site. Attendance is highly encouraged. Please follow the current CDC's social distancing guidelines during the site visit. RSVP site visit attendance to Stan Johnson sjjohnson@blm.gov. Questions Due Date: Due September 02, 2022 12:00 pm MT by email: tbluntmayes@blm.gov. Quote Submittal Information: Due September 14, 2022 12:00 MT pm by email: tbluntmayes@blm.gov See Section L for quote submittal requirements Period of Performance: 90 calendar days from Notice to Proceed (NTP). Issuance of NTP will be done at time of award. (Estimated performance period to be October - February) Award Selection Process: As described in Section M Bonds: Bid bond is required. Performance and Payment bond required 10 days after award of contract *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Furnishing labor, equipment, supplies, and materials to for the rehabilitation of Poison Spider Trailhead Access Road. The Contractor shall be responsible for all labor, materials, and equipment needed for the construction per drawings and specifications. Work under this Contract is located in Grand County, Utah. Work location is Poison Spider Trailhead and trailhead access road, on the east side of Utah, adjacent to State Route 279, 4 miles south of Hwy 95 (10 miles travel southwest of Moab, UT; see attached map). (3832'0.25"N, 10936'27.45"W) The Contractor shall furnish he necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J. The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract

Award

Roads / Highways

$78,874.00

Public - Federal

Paving, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
2
Bidding Soon
56
All Active Projects
26
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2022

October 1, 2022

img_map_placeholder

Poison Spider Trail, Moab, UT

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.