BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a medical facility in Martinez, California. Completed plans call for the renovation of a 2,098-square-foot medical facility.

The prime contractor for this project shall hold a valid Class B General Building Contractor license. The project includes the remodel of 2098 SF to create an outpatient Crisis Stabilization Unit in an existing clinic building at the Miller Wellness Center. Includes all aspects of a fully functional tenant improvement including but not limited to interior partitions, MEP, doors & windows, fire alarm modifications, fire sprinkler modifications, casework and security alterations. Each bid is to be in accordance with the drawings and specifications on file at the Office of the Clerk of the Board of Supervisors, First Floor, County Administration Building, 1025 Escobar Street, Martinez, California. Technical questions regarding the contract documents should be directed in writing to the Capital Projects Management Division at James.Langston@pw.cccounty.us. All questions must be received no later than 3:30PM on September 6 th , 2022. Each bid shall be made on the bid form issued with the specifications and must be accompanied by bid security in the form of cash, a certified check, cashiers check, or bid bond in the amount of the ten percent (10%) of the base bid amount, made payable to The County of Contra Costa. The bid security shall be given as a guarantee that the bidder will enter into a contract if awarded the work, and will be forfeited by the bidder and retained by the County if the successful bidder refuses, neglects or fails to enter into said contract or to furnish the necessary bonds and insurance certificates after being requested to do so by the County. Bidders are hereby notified that securities may be substituted for any monies withheld by the County of Contra Costa to ensure performance under the construction contract, in accordance with Public Contract Code Section 22300 and the General Conditions of the Contract. Such securities shall be valued by the County Treasurer-Tax Collector, whose decision shall be final. Also, types of securities which are not listed in Government Code Section 16430 or Public Contract Code Section 22300 must be approved as eligible for investment under Public Contract Code Section 22300 by the County Treasurer-Tax Collector before bid opening. Unless such securities are prequalified before bid opening, they shall not be accepted by the County as security. The successful bidder will be required to furnish a Payment Bond in an amount equal to one hundred percent (100%) of the Contract price and a Faithful Performance Bond in an amount equal to one hundred percent (100%) of the Contract price, said bonds to be secured from an admitted surety insurer authorized by the Insurance Commissioner to transact business of insurance in the State of California. Each bond shall be issued on the form set forth in the specifications. Bidders are hereby notified that pursuant to the Statutes of the State of California, or local law applicable thereto, the said Board has obtained the general prevailing rate of per diem wages and rates for legal holidays and overtime work in the locality in which this work is to be performed for each type of worker or mechanic required to execute the contract which will be awarded to the successful bidder. The prevailing rate of per diem wages is on file with the Clerk of the Board of Supervisors. The Contra Costa County Board of Supervisors encourages opportunities to develop and support Minority Business Enterprises (MBEs), Women Business Enterprises (WBEs), Small Business Enterprises (SBEs), Local Business Enterprises (LBEs), and Disabled Veterans Business Enterprises (DVBEs) by providing opportunities for participation in the performance of construction contracts financed in whole or in part with County funds. MBE, WBE, SBE, LBE, and DVBE definitions and detailed information are included in Division E of the Specifications The said Board reserves the right to reject any and all bids or any portion of any bid and/or waive any irregularity in any bid received. Bids may not be withdrawn for a period of 60 days after the date set for opening thereof.

Award

Medical

$1,365,000.00

Public - County

Renovation

60

22

63

8

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
90
Bidding Soon
1,881
All Active Projects
790
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2022

November 14, 2022

img_map_placeholder

25 Allen St, Martinez, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.