BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a power facility in Danville, Virginia. Completed plans call for site work for a power facility.

5% Bid Bond; Performance and Payment Bonds Liquidated Damages : $500.00 (Five Hundred Dollars per calendar day) . Last Day for Questions shall be submitted via E-mail: purchasing@danvilleva.gov no later than Tuesday June13,2023 by 12:00PM Direct Inquiries To: Bidding Procedures:Carol Henley, Director of Purchasingpurchasing@danvilleva.gov (434) 799-6528 Technical Questions: Philip Haleyphilip.haley@danvilleva.gov(434) 799-5270 The Owner reserves the right to reject any or all Bid Proposals . The time of the Completion of Construction of the project is of the essence of the Contract. Should the Bidder neglect, refuse or fail to complete the construction within the time herein agreed upon, after giving effect to extensions of time, if any, herein provided, then, in that event and in view of the difficulty of estimating with exactness damages caused by such delay, the Owner shall have the right to deduct from and retain out of such moneys which may be then due, or which may become due and payable to the Bidder the sum of five hundred dollars ($500.00 ) per day for each and every day that such construction is delayed in its completion beyond the specified time, as liquidated damages and not as a penalty if the amount due and to become due from the Owner to the Bidder is insufficient to pay in full any such liquidated damages, the Bidder shall pay to the Owner the amount necessary to effect such payment in full: Provided, however, that the Owner shall promptly notify the Bidder in writing of the manner in which the amount retained, deducted or claimed as liquidated damages was computed. The new 69 - 12.5 kV transformer T2 at Airside is due to arrive in April-May time frame. . At Westfork Substation the new expansion area with all grading and fencing needed will be done by Danville Utilities, probably prior to the start of construction. . Removals and disposals will be totally the responsibility of the contractor. . All materials removed from service shall be disposed of by the contractor. .The pads for the 2 - 69 kV Siemens breakers in the back of Airside are part of this project. .Airside will be de-energized when needed, but the 69 kV transmission loop through the substation will remain energized until near the end of the project. .Work may be performed between 7-5 M-F except holidays. Other hours may be worked with prior approval from Danville Utilities. Working longer hours M-W is also acceptable if coordinated with the DU. .Anchor bolts for new steel structure foundations will be provided by DU. All breaker anchor bolts will need to be provided by the contractor. .On the UG feeders exiting Airside approximate distances: Substation dips to 1 st manhole - 165' 1st manhole to second manhole (existing conduit) - 420'2nd manhole to farthest dip pole - 280'

Post-Bid

Power Plant

$600,000.00

Public - City

Site Work

3

8

6

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
45
Bidding Soon
1,242
All Active Projects
509
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2023

July 20, 2023

img_map_placeholder

Multiple Locations, Danville, VA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.