BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 15, 2022 at 8:00 PM

Updated September 15, 2023

Site work for a water / sewer project in Moorpark, California. Completed plans call for site work for a water / sewer project.

Provide all labor, tools, equipment, and incidentals to install a replacement micro bar screen, furnished by the District, inside the Moorpark Water Reclamation Facility headworks. 1. Mobilize personnel and equipment to the job site. 2. Insurance and Bonding. 3. Demolish and dispose of existing bar screen and all related appurtenances. 4. Thoroughly educate personnel on all installation instructions described in the Operation and Maintenance Instruction manual, including but not limited to: a. Installation procedures b. Installation of screen in channel c. Installation of control panel d. Installation inspection and startup e. Installation of anchor bolts f. Installation of accessories g. Mechanical and electrical drawings 5. Perform all necessary layout work. 6. Perform installation of mounting posts at least 1 day prior to bar screen installation. 7. Perform installation of bar screen, including anchors and brackets, following proper lifting procedures as outlined in the Operation & Maintenance Instruction manual. 8. Perform mounting and installation of local control panel after confirming the screen installation position and routing for the electrical conduit. Unistrut assembly, wedge anchors, floor mounts and hardware shall be stainless steel and all conduits shall be PVC-coated rigid steel. 9. Perform cable wiring and all electrical work as directed in the Operation & Maintenance Instruction manual to ensure proper functioning of bar screen. This includes verifying rotational direction by bumping the machine (energizing for a second or two) to prevent damage to the machine. 10. Perform installation of new level sensors as per the specifications of the engineering drawings from the Operation & Maintenance Instruction manual. Pull and land sensory cable back to the local control panel. Supply and install PVC-coated rigid steel conduit, to run above grade on Unistrut, into the control panel. 11. Perform mechanical and electrical pre-commissioning checks, ensuring rake teeth are centered between the screens bars, the units frames are square and parallel and chain tension is properly adjusted, and all other crucial check points for start-up listed in the Operation & Maintenance Instruction manual are verified. 12. Complete the Inspection Report for Installation & Start Up (page 16 of the Operation & Maintenance Instruction manual) and return to District. 13. Provide 1 day of site start up assistance. 14. De-mobilize from the site and leave site in a clean and orderly state, free from all waste or debris. Notes: i. Any discrepancies from the Operation & Maintenance Instruction manual and/or faults found during inspections must be immediately brought to the attention of the District for guidance, without which no work is to proceed. ii. Contractor shall conduct work on a daily work schedule between the hours of 7 a.m. to 4 p.m. Monday through Friday, holidays excluded. Off hours work requires prior approval from the District. iii. All materials shall be submitted to and approved by District. Total Quote Amount Minimum Contractor License C-10 (and a General a Preferred, but Not Required) Please Circle Yes or No Questions Due Date: Never PN - OPP2607

Award

Water / Sewer

$116,600.00

Public - County

Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
414
Active Projects
149
Bidding Soon
2,998
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2022

October 10, 2022

Project location map

9550 E Los Angeles Ave, Moorpark, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.