BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Moorpark, California. Completed plans call for site work for a water / sewer project.

Provide all labor, tools, equipment, and incidentals to install a replacement micro bar screen, furnished by the District, inside the Moorpark Water Reclamation Facility headworks. 1. Mobilize personnel and equipment to the job site. 2. Insurance and Bonding. 3. Demolish and dispose of existing bar screen and all related appurtenances. 4. Thoroughly educate personnel on all installation instructions described in the Operation and Maintenance Instruction manual, including but not limited to: a. Installation procedures b. Installation of screen in channel c. Installation of control panel d. Installation inspection and startup e. Installation of anchor bolts f. Installation of accessories g. Mechanical and electrical drawings 5. Perform all necessary layout work. 6. Perform installation of mounting posts at least 1 day prior to bar screen installation. 7. Perform installation of bar screen, including anchors and brackets, following proper lifting procedures as outlined in the Operation & Maintenance Instruction manual. 8. Perform mounting and installation of local control panel after confirming the screen installation position and routing for the electrical conduit. Unistrut assembly, wedge anchors, floor mounts and hardware shall be stainless steel and all conduits shall be PVC-coated rigid steel. 9. Perform cable wiring and all electrical work as directed in the Operation & Maintenance Instruction manual to ensure proper functioning of bar screen. This includes verifying rotational direction by bumping the machine (energizing for a second or two) to prevent damage to the machine. 10. Perform installation of new level sensors as per the specifications of the engineering drawings from the Operation & Maintenance Instruction manual. Pull and land sensory cable back to the local control panel. Supply and install PVC-coated rigid steel conduit, to run above grade on Unistrut, into the control panel. 11. Perform mechanical and electrical pre-commissioning checks, ensuring rake teeth are centered between the screens bars, the units frames are square and parallel and chain tension is properly adjusted, and all other crucial check points for start-up listed in the Operation & Maintenance Instruction manual are verified. 12. Complete the Inspection Report for Installation & Start Up (page 16 of the Operation & Maintenance Instruction manual) and return to District. 13. Provide 1 day of site start up assistance. 14. De-mobilize from the site and leave site in a clean and orderly state, free from all waste or debris. Notes: i. Any discrepancies from the Operation & Maintenance Instruction manual and/or faults found during inspections must be immediately brought to the attention of the District for guidance, without which no work is to proceed. ii. Contractor shall conduct work on a daily work schedule between the hours of 7 a.m. to 4 p.m. Monday through Friday, holidays excluded. Off hours work requires prior approval from the District. iii. All materials shall be submitted to and approved by District. Total Quote Amount Minimum Contractor License C-10 (and a General a Preferred, but Not Required) Please Circle Yes or No Questions Due Date: Never PN - OPP2607

Award

Water / Sewer

$116,600.00

Public - County

Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
377
Active Projects
177
Bidding Soon
3,006
All Active Projects
1,338
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 9, 2022

October 10, 2022

November 17, 2022

img_map_placeholder

9550 E Los Angeles Ave, Moorpark, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.