Site work and new construction of a mixed-use development in Yakima, Washington. Completed plans call for the construction of a water / sewer project.
The Contractor shall provide all supervision, labor, equipment, and materials to perform all work required for these items under project entitled, construct New Well at Lower Foster located at Yakima Training Center, Washington. The existing Lower Foster Well was completed in 1995 to a depth of 590 feet and is a nonpotable production well serving a fire storage tank at the site. The well was originally capable of pumping 15 gallons per minute (gpm). However, it never sustained a pump rate of 15 gpm. The pump was replaced in 2016 with a Grundfos dual-voltage pump which was sized and throttled to provide 3.1 gpm. A pump rate of 3.1 gpm does not allow the pump to meet flow rate demand to fill the existing 20,000-gallon storage tank daily. This project is to add a new well closer to the Creek bed and demolish existing well. This project includes decommissioning the existing well and replacing it at a location approximately 1,400-feet to the south with a new non-potable water system well which includes discharge line serving the existing fire storage tank that is to remain. The new well was drilled in May 2020, and Shannon and Wilson have prepared a hydrogeological report for the new well. In accordance with FAR 36.204, the magnitude of construction for this project is between $1,000,000 and $5,000,000. The Government anticipates receipt of funding; however, no Task Order will be awarded unless and until funds become available for this requirement. As noted in the Base Contract, Section 00 73 00, a bid bond is not required with submission of your proposal in response to this RFP. However, Performance and Payment bonds will be required after Task Order award Liquidated damages will be assessed on this Task Order at a rate of $835.00 per calendar day of delay until the work is completed or accepted; in accordance with the Base Contract, FAR Clause 52.211-12. The Contractor is required to commence work under this Task Order within five (5) business days after the date of issuance of the Notice to Proceed (NTP) for the Base Item(s), prosecute the work diligently, and complete all work on all Base Item(s) no later than 270 calendar days after the date of issuance of the Notice to Proceed for the Base Item(s). The time stated for completion includes final cleanup of the premises and submission of all required close-out documentation. Davis Bacon Act: YES
Post-Bid
Water / Sewer
$5,000,000.00
Public - Federal
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 7, 2022
September 26, 2022
To Be Determined, Yakima, WA
Related To This Project
Yakima, WA
Bid Date: Mar 15 2023
Yakima, WA
Bid Date: Sep 12 2022
Yakima, WA
Bid Date: Sep 16 2022
Yakima, WA
Bid Date: Aug 10 2022
Yakima, WA
Bid Date: Dec 13 2023
Yakima, WA
Bid Date: Aug 03 2022
Yakima, WA
--
Yakima, WA
Bid Date: Aug 17 2022
Yakima, WA
Bid Date: Dec 15 2021
Yakima, WA
Bid Date: Aug 03 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.