Demolition, site work and new construction of a parking garage in Hinckley, Minnesota. Completed plans call for the demolition of a parking garage; for the construction of a parking garage; and for site work for a parking garage.

Work Scope Description: Unless otherwise noted all work shall be completed according to the 2016 MLB Spec Book. Detached garage: a. Front of garage shall be approximately 30' back from edge of asphalt on Water Lily Drive. The left wall of the garage shall be 20' away from the right edge of asphalt on existing driveway. b. Prep site area for floating slab construction. Remove top soil and vegetation and install a 18" sand cushion. Form and pour 4" Thickened edge slab with vapor barrier per drawing detail. Include a course 6" wide x 8" high block around perimeter of slab to ensure 6" separation between bottom plate and finished grade. Elevation: top of floor shall be 6" higher than top of asphalt on Water Lily Drive at garage entrance driveway. c. Relocate detached 24 x 24' garage located at 30874 Water Lily Drive. d. Install garage on new slab. e. Include electrical as shown on plan. Install a 60 amp panel in garage with (2) 20 amp circuits. Supply and install meter socket on the exterior of the garage. Run underground secondary wiring to new staked transformer location. New transformer location is approx. 60' SE of the front right corner of the garage proposed location. f. Provide and install overhead garage door per spec. book. Door color shall be Sandstone. g. Demo and replace jamb flashing and weather stripping. New flashing shall be Clay in color. h. Demo & replace lock set per Spec Book. i. Demo and replace all damaged; or supply and install fascia flashing and soffits. New fascia and soffit color shall match existing. j. Supply and install gutters, downspouts, leaf guards and concrete splash pads. Gutters to discharge at rear of garage. (Match fascia/ soffit color) k. Demo and replace damaged; or supply and install missing siding, channel and accessories. Match existing garage siding color. l. Demo all existing exterior light fixtures. Supply and install new Patriot Lighting dualux LED dual head motion sensor exterior fixtures model: E9201WH. Include supply and install of all new LED bulbs. m. Pour a 4' concrete garage apron sloped down to driveway. Include #4 rebar reinforcement 24" o.c. and control joints no more than every 4'. Include an expansion joint at garage slab abutment. Driveway Construction: Left edge of new driveway shall be located approximately 24' to the right of the existing driveway's asphalt (measuring from straight edge of driveway not flared edge). This should leave approx. 20' between the existing driveway and the relocated garage's west-facing wall. Driveway shall be 20' wide with flared garage approach and 26' in length. Top of driveway should include a slight crown. Contractor shall construct new driveway as follows: Subcut for driveway base. Contractor is responsible for removal and export of any excess soils or fill quantities that cannot be used onsite. Contractor shall install 6" of class 5 material with 2" topping of reclaimed asphalt or crushed concrete. Grade work: a. Maintain level grade around perimeter of the garage slab 4' on front and sides and 6' at rear; then start sloping. This project is not subject to the no more than 12" drop in 10' restriction listed in the Spec Book. Final grade shall be within 1" of top of slab height. b. Ensure that the ditch created between the new garage and existing driveway will provide sufficient runoff. c. Contractor is responsible for regrading and seeding any areas of the yard that they damage. Include a $3,000 allowance to be used at Owner's discretion for additional excavation and/ or fill required for soil corrections discovered once work commences. No work shall be compensated if it was not approved by the Owner prior to completion. Mobilization and Project Schedule: The Contractor shall be capable of mobilizing his equipment, crews, and subcontractors within 30 days of notice to proceed. Project will be complete no later than July 31, 2023. General contractor expected to immediately, upon receipt of fully executed contract, source all required materials and products required for the project. Contractor must immediately notify project coordinator of items with long lead times that may impact project schedule. Contractor shall provide means and methods for all building phases of construction. Liquidated damages for exceeding specified timeframes will be in all contracts. COMMUNITY DEVELOPMENT/PROJECT MANAGEMENT RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS FOR ANY REASON.

Post-Bid

Parking Garage

$200,000.00

Public - Federal

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
37
Bidding Soon
490
All Active Projects
180
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2022

October 7, 2022

img_map_placeholder

30807 Water Lily Dr, Hinckley, MN


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.