Site work and new construction of a pre-engineered storage facility in Mount Vernon, Iowa. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

It Includes all labor, materials, and equipment necessary for mobilization, grading and site work, designing, providing and erecting two pre-engineered post frame storage buildings, construction of concrete footings, cleanup and miscellaneous associated work. Project Scope 1: Construct North Storage Building 20 improvements including all labor, materials, and equipment necessary for mobilization, grading and site work, designing, providing and erecting pre-engineered post frame storage building, construction of concrete footings, cleanup and miscellaneous associated work Low bids: Low: Peak Construction $245,600 2nd: Robison Construction $247,914 3rd: The Henley Group $275,000 4th: Knutson Construction $447,000 Project Scope 2: Construct South Storage Building 10 improvements including all labor, materials, and equipment necessary for mobilization, grading and site work, designing, providing and erecting pre-engineered post frame storage building, construction of concrete footings, cleanup and miscellaneous associated work Low Bids: Low: Peak Construction $259,000 2nd: Robison Construction $272,842 3rd: The Henley Group $285,000 4th: Knutson Construction $439,000 Project Scope 3: Construct North Storage Building 20 and South Storage Building 10 improvements including all labor, materials, and equipment necessary for mobilization, grading and site work, designing, providing and erecting pre-engineered post frame storage buildings, construction of concrete footings, cleanup and miscellaneous associated work Low Bids: Low: Peak Construction $504,600 2nd: Robison Construction $520,756 3rd: The Henley Group $550,000 4th: Knutson Construction $876,000 Work on the improvements shall commence within ten days of the issuance of a written Notice to Proceed. The Notice to Proceed will be issued upon approval of the contract by the Council and be completed as stated below. Upon receiving deposit check, plans and specifications will be mailed out. When plans and specifications are returned in good condition within 14 days of the award date of the project, deposit checks will be returned. All proposals and bids in connection therewith shall be submitted to the City Clerk of said City on or before the time herein set for receiving bids. All proposals shall be made on official bidding blanks furnished by the City, and any alternations in the official form of proposal will entitle the Council, at its option, to reject the proposal involved from consideration. Each proposal shall be sealed and plainly identified. Each proposal shall be made out on a blank form furnished by the municipality and must be accompanied by bid security, as follows: a certified or cashier's check, drawn on a solvent Iowa bank or a bank chartered under the laws of the United States or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to five percent (5%) of the bid, or a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa in a penal sum of five percent (5%) of the bid. The bid security should be made payable to the CITY OF MOUNT VERNON, IOWA. The bid security must not contain any conditions either in the body or as an endorsement thereon. The bid security shall be forfeited to the City as liquidated damages in the event the successful bidder fails or refuses to enter into a contract within 10 days after the award of contract and post bond satisfactory to the City insuring the faithful fulfillment of the contract and the maintenance of said work, if required, pursuant to the provisions of this notice and other contract documents. Bidders shall use the bid bond form bound in the specifications. No bidder may withdraw a proposal within thirty (30) days after the date set for opening bids. The successful bidder will be required to furnish a bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor, and shall guarantee the work against faulty workmanship and materials for a period of four (4) years after its completion and acceptance by the City Council. All Contractor(s) and subcontractor(s) are required to obtain tax exemption certificates from the City of Mount Vernon, Iowa for this project. These tax exemption certificates are only for use on this specific project as covered under the Contract. The work under the contract shall commence within ten (10) days after date set forth in written Notice to Proceed. All work shall be completed by July 1, 2023, subject to any extensions of time which may be granted by the City Council. Liquidated damages in the amount of Five Hundred Dollars ($500.00) per consecutive calendar day will be assessed for each day that work shall remain uncompleted after the end of the contract period, with due allowance for extensions of the contract period due to conditions beyond the control of the Contractor. Payment to the Contractor for said improvements will be made in cash derived from the proceeds of the issuance and sale of such bonds and/or from such cash funds of the City as may be legally used for said purposes. Any combination of the above methods of payment may be used at the discretion of the City Council. Payment to the Contractor will be on the basis of monthly estimates equivalent to ninety-five percent (95%) of the contract value of the work completed and payments made to material suppliers for materials ordered specifically for the project or delivered to the site during the preceding calendar month. Estimates will be prepared on the last day of each month by the Contractor, subject to the approval of the Engineer, who will certify to the City for payment each approved estimate on or before the tenth (10th) day of the following month. Such monthly payments shall in no way be construed as an act of acceptance for any part of the work partially or totally completed. Upon completion of the work and its acceptance by the Council, the Contractor will be paid an amount which, together with previous payments, will equal ninety five percent (95%) of the contract price of the contract. Final payment of the remaining five percent (5%) will be made not less than thirty-one (31) days after completion and acceptance by resolution of the City Council of the completed contract, subject to the conditions and in accordance with the provisions of Chapter 573 of the Code of Iowa, as amended. No such partial or final payments will be due until the Contractor has certified to the City that the materials, labor and services involved in each estimate have been paid for in accordance with the requirements stated in the specifications. The request for payment may also include an allowance for the cost of such major materials and equipment which are suitably stored either at or near the site. Proof of purchase amount and verification of insurance for stored materials must be provided with any request for payment of stored materials. By virtue of statutory authority preference will be given to products and provisions grown and coal produced within the State of Iowa and to Iowa domestic labor. In accordance with Iowa statutes, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. In accordance with the requirements of the Iowa Department of Labor all bidders must submit a fully completed Bidder Status Form. The Bidder Status Form must be included with and is considered an essential attachment to the Proposal. Any Proposal that does not include a fully completed Bidder Status Form may result in the Proposal being determined non-responsive and rejected. If it is determined that adherence to these Iowa statutory requirements may cause denial of federal funds which would otherwise be available for a public improvement, or would otherwise be inconsistent with requirements of any federal law or regulation, the application of Iowa Code Chapters 73 and 73A shall be suspended to the extent necessary to prevent denial of the funds or to eliminate the inconsistency with federal requirements. 51336 00050-4. The City of Mount Vernon reserves the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the City.

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$504,600.00

Public - City

New Construction, Site Work

7

14

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
38
Bidding Soon
477
All Active Projects
226
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2022

December 7, 2022

img_map_placeholder

213 1st St W, Mount Vernon, IA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.