BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 14, 2022 at 7:00 PM

Updated January 25, 2024

Site work and paving for a mixed-use development in Birmingham, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

7 streets in the SE corner of Birmingham that are existing capesealed roads need to be recapesealed (more then 1 mile of total road length) with sidewalk concrete for ADA ramps to be replaced as needed. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 5 % Length 6,000 ft + Question Acceptance Deadline 11/28/2022 12:00 PM EST Questions are submitted online No Sworn Statement of Qualifications must be submitted to the Engineering Division, City of Birmingham, prior to the bid opening AT 2:00 p.m., December 2, 2022

Post-Bid

Roads / Highways

$375,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
319
Active Projects
155
Bidding Soon
2,438
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2022

January 2, 2023

Project location map

Multiple Locations, Birmingham, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.