Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Miami, Florida. Contact the soliciting agency for additional information.
Project Location: Four (4) Residential Locations License Requirements: Primary: General Building Contractor Sub: Electrical Contractor; Air Conditioning Unlimited Work Site Address: 1910 NW 1 Place Work Site Address: 1530 NW 175 Terrace Work Site Address: 18060 SW 155 Court Work Site Address: 12950 SW 242 Terrace Performance & Payment Bond Required: NO Bid Bond Required: NO If you have any questions, contact Martha Perez at 786-469-4729. Anticipated Start Date: 9/2/2022 Calendar Days for Project Completion: 30 Install Smoke Detectors, Install CO Detector, Replace Bathroom Exhaust Fan, Install Kitchen Exhaust Fan, Install Aerators, Install Shower Heads, Provide CFLs Bulbs, Remove and Replace Exterior Metal Door, Replace Water Heater, Replace Refrigerator, A/C Duct Leak Repair Install or add insulation: Furnish and install, blown type Fiberglass attic insulation to the attic with a uniform R- value. Attic insulation must have; meet a minimum R-value of R-30. Contractor must barrier and seal any electrical box, knob tube wiring from insulation or any air penetration to the conditioned space prior blow attic insulation is installed. Contractor shall ensure that the insulation reaches the attic edges of the roof. Fill the edges of the attic first, near the eaves or gable end, then fill the center to a consistent insulation depth. Install an insulation depth ruler on every 300 square feet of attic area achieving R value of R-30. Depth rulers and certificate should face the attic entrance to facilitate inspection. Post an insulation certificate with the installer information such as name of company installing insulation, name of installer, date, insulation type, lot or batch #, R-Value, number of bags, sq. ft. of coverage, and thickness in inches. .Contractor is responsible to obtain an R-30 thickness regardless of the bags estimated. Air Conditioner: Replacement: Furnish and install Carrier or Rheem cooling and heating unit, high efficiency (13 seer or better at a minimum), connected to electricity as per code and manufacturer's specifications. Cover and seal all holes inside A/C closet, damage wall or ceiling at time of replacing the new A/C and provide the Air filters. Must seal A/C ducts and wiring around plenum that egress the attic or walls. There should be NO air infiltration or exfiltration inside where A/C reside after A/C replacement. o New poured concrete slab and straps for compressor and any permits required. o Provide supply lines. o Provide Freon lines and Freon Please see RPQ for full scope of work and location detail. GENERAL WARRANTY Materials installed and work performed shall have a one-year Contractor warranty from the date of final acceptance of the work by the Owner and Project Manager. Roof warranties must be valid for a period of no less than five years from final completion date of all work required under this contract BUILDING DEPARTMENT INSPECTIONS Building Department Inspections shall be as per Florida Building Code and Miami Dade County Building Code Work that has been concealed without a Compliance Inspection may result in payment delays or denial. Contractor shall be responsible for requesting all mandatory inspections as per Florida Building Code and Miami Dade County Building Code. GENERAL CLEAN-UP Contractor is to provide clear and safe passageways in and around the structure during the project. Contractor to remove all debris and materials from in and around structure being repaired at the end of each work day. All shall be stored on site in a code approved storage container or dumpster and be legally dumped at a code approved dump or recycling center regularly and at the end of the project. In progress and final clean-up to include-but is not limited to-damp wiping, sweeping, mopping and vacuuming. Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work.
Award
Residential Subdivision
$55,270.00
Public - County
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 24, 2022
September 2, 2022
Multiple Locations, Miami, FL
Related To This Project
Miami, FL
Bid Date: Aug 31 2022
Miami, FL
--
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: Aug 30 2022
Miami, FL
Bid Date: Aug 31 2022
Miami, FL
Bid Date: Sep 01 2022
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: Jul 25 2022
Miami, FL
Bid Date: Aug 30 2022
Miami, FL
Bid Date: Jun 14 2022
Miami, FL
Bid Date: Jul 19 2022
Miami, FL
Bid Date: Aug 26 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.