BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in La Homa, Texas. Completed plans call for site work for a water / sewer project.

**As of October 25, 2022, project was awarded to RC8 Construction, LLC., awarded amount is $431,811.41.** Project consists of various sewer line relocations to include an 8-inch Force main, manholes, and 8-inch gravity sewer line in support of TxDOT roadway improvements to West FM 676 (Main Avenue) between La Homa Road and Alton Boulevard. A bid bond in the amount of 5 percent of the bid issued by an acceptable surety shall be submitted with each bid. A certified check or bank draft payable to the City of Alton or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond. Equal Opportunity in Employment - All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, age, handicap or national origin. Bidders on this work will be required to comply with the Presidents Executive Order No. 11246, as amended by Executive Order 11275, and as supplemented in Department of Labor regulations 41 CFR Part 60. The City of Alton is an Affirmative Action and Equal Opportunity Employer. The City of Alton reserves the right to reject any or all bids or to waive any informality in the bidding. In case of ambiguity or lack of clearness in stating prices inanybid,the Owner reserves the right to consider the most advantageous construction thereof or to reject the bid. The contract will be awarded to the lowest responsible bidder. Bids may be held by the City of Alton for a period not to exceed 90 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidders qualifications prior to the contract award. Work of the Project consists of adjusting existing sanitary sewer mains along Main Avenue (FM 676) and Trosper Avenue to allow for connections of future developments outside of the TxDOT pavement limits. Improvements include installation of sanitary sewer manholes, sanitary sewer pvc pipe, force main installation, and removal and replacement of existing asphalt pavement for the existing asphalt roadways.

Award

Water / Sewer

$431,811.00

Public - City

Site Work

15

9

2

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
9
Bidding Soon
287
All Active Projects
125
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2022

October 21, 2022

img_map_placeholder

W Main Ave, La Homa, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.