BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in La Quinta, California. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of Nove,ber 04th, 2022, project was awarded to Ortiz Enterprises, Inc. in the amount of $21,635,759.60. The purpose of the project is to replace the existing low water crossing spanning the Coachella Valley Storm Water Channel (CVSC) at Dune Palms Road with a bridge crossing. The proposed work includes the roadway approach reconstruction to meet the proposed bridge structure elevation; street widening; construction of curb, curb/gutter, sidewalk, trail, retaining walls, median paving, driveway approaches, concrete slope protection and 6-foot tall garden wall; asphalt pavement with aggregate base; bridge construction; crack sealing and slurry sealing of roadway within construction limits; construction of a catch basins and drywells along with 18" and 24" HDPE N-12 pipe; signing and striping; landscaping and irrigation; and undergrounding of existing overhead utility poles. Project will also require the construction and removal of a bypass road, along with CVWD water main and sanitary sewer relocations. The sewer relocations will require the Contractor to prepare and implement a sewer bypass plan, which will need to be approved by CVWD. Contractor will also be required to demolish two mobile homes along with the single-family home as noted in the plans, includes the clearing of each housing pad and disconnecting all utilities connections to the structures. All project work and incidental items to complete the project shall be performed in accordance with the plans, specifications, and other provisions of the contract. All the above improvements are to be constructed in a workmanlike manner, leaving the entire project in a neat and presentable condition. Refer to Sections 3000 and 4000 for more information. This project shall be completed within 475 working days from the date specified in the Notice to Proceed. Time for the commencement and completion of the work is important and is to be of the essence of the Contract. The successful bidder should plan to order any long lead time equipment items immediately following Notice of Award. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Thsi project has an estimated value range of $16 Mil-$18 Mil.

Award

Bridges / Tunnels

$21,635,760.00

Public - City

Paving, Site Work

87

13

9

4

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
282
Active Projects
133
Bidding Soon
1,728
All Active Projects
832
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 5, 2022

December 5, 2022

img_map_placeholder

Dune Palms Rd, La Quinta, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.