BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a water / sewer project in Norwood, Ohio. Completed plans call for site work for a water / sewer project.

The project includes, but is not limited to, the construction of the work as generally described below and all other appurtenances and related work required: The addition of a new system interconnect at the intersection of Wayne and Section Avenues. The interconnect will include a pressure reducing valve (PRV) to be installed in a new buried concrete vault within the existing right-of-way. The valve, piping and appurtenances will be designed to conform to existing standards and practices from GCWW. Reconfiguration of the existing interconnect near the intersection of Montgomery Road and Cypress Way. This improvement includes a new PRV to be installed in a new buried concrete vault within the existing right-of-way. The valve, piping and appurtenances will be designed to conform to existing standards and practices from GCWW. A new piping connection between the Indian Mound Avenue and Highland Avenue Pressure Zones at the site of the existing tanks. The two high pressure zones shall be connected to increase pressure and available fire flow within the Indian Mound Avenue area and by-pass the existing tanks. This connection shall be accomplished by installing approximately thirty feet of piping around the inlet to the existing tanks which will also allow the tanks to be isolated from the rest of the system for removal. The addition of surge relief system at the intersection of Spencer and Lexington Avenues. The new system will be installed in a new buried concrete vault within the existing right-of-way. The surge relief valve, piping, and appurtenances will be designed to conform to any applicable standards and practices from GCWW. Flow from the overpressure relief system shall discharge to an existing storm sewer, or by sheet flow over land, depending on existing site conditions and available infrastructure. The addition of a surge relief valve system at the intersection Minot Road and Edwards Road. The new system will be installed in a new buried concrete vault within the existing right-of-way. The surge relief valve, piping, and appurtenances will be designed to conform to any applicable standards and practices from GCWW. Flow from the overpressure relief system shall discharge to an existing storm sewer, or by sheet flow over land, depending on existing site conditions and available infrastructure. The addition of a surge relief valve system at intersection Madison Road and Edwards Road. The new system will be installed in a new buried concrete vault within the existing right-of-way. The 30087957 00 11 13-2 surge relief valve, piping, and appurtenances will be designed to conform to any applicable standards and practices from GCWW. Flow from the overpressure relief system shall discharge to an existing storm sewer, or by sheet flow over land, depending on existing site conditions and available infrastructure. The project will be funded through a WSRLA loan. The successful Bidder shall comply with all related requirements as detailed in the Bidding Documents. All qualified applicants will receive consideration for employment without regard to race, colour, religion, sec, or national origin. This procurement is subject to the EPA policy of encouraging the participation of small business in rural areas (SBRAs). Bidders must comply with the prevailing wage rates on Public Improvements in Hamilton County, Ohio The City of Norwood, Ohio reserves the right to reject any and all bids to waive any informalities or irregularities, and further, reserves the right to accept any bids or parts of bids which it deems to best serve the interest of the City of Norwood, Ohio. QA Deadline 08/25/2022 12:00 PM EDT The Work shall be substantially completed within 180 calendar days after the date when the Contract Times commence to run

Award

Water / Sewer

$695,000.00

Public - City

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
83
Bidding Soon
1,267
All Active Projects
551
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2022

October 10, 2022

img_map_placeholder

Multiple Locations, Norwood, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.