BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Burley, Idaho. Completed plans call for the renovation of a educational facility.

Remove mechanically attached single ply roofing membrane, asbestos containing (3) ply B.U.R. 1 wood fiber board down to the existing wood roof deck. Install new single ply roofing system consisting of a minimum 80 mil TPO fully adhered over (2) layers of 2.6 polyisocyanurate fully adhered over self-adhering vapor barrier over substrate board mechanically attached and associated flashing at vertical walls & roof penetrations. TPO coated metal flashing and TPO coated metal drip edge. Remove mechanically attached single ply roofing membrane, asbestos containing (3) ply B.U.R. 1 wood fiber board down to the existing wood roof deck. Install new single ply roofing system consisting of a minimum 80 mil TPO fully adhered over (2) layers of 2.6 polyisocyanurate fully adhered over self-adhering vapor barrier over substrate board mechanically attached and associated flashing at vertical walls & roof penetrations. TPO coated metal flashing and TPO coated metal drip edge. Install new single ply roofing system consisting of a minimum 80 mil TPO mechanically attached over cover board mechanically over (2) layers of 2.6 polyisocyanurate mechanically attached over self-adhering vapor barrier over substrate board mechanically attached and associated flashing at vertical walls & roof penetrations, new TPO metal drip edge, pre-finished metal fascia & clip and 24 Ga. pre-finished metal coping. Remove fully adhered single-ply roofing membrane and associated flashings only. Existing 1.5 polyisocyanurate to remain in place. Install new single ply roofing system consisting of minimum 80 mil TPO fully adhered over new cover board, fully adhered over (1) layer of new 2.6 polyisocyanurate fully adhered over (1) layer of existing 1.5 polyisocyanurate over (2) ply asphalt vapor barrier over substrate board. A bid bond in the amount of 5% of the total bid amount, including any add alternates, is required. A Public Works Contractors License for the State of Idaho is required to bid on this work. Bidder hereby agrees to commence Work under this Contract on a date to be specified in the written "Notice to Proceed" of the Owner and to substantially complete the Project within Sixty (60) consecutive calendar days thereafter, as stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the sum of $500 for each consecutive calendar day after the established substantial completion date oradjusted date as established by change order.

Award

Educational

$400,600.00

Public - State/Provincial

Renovation

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
4
Bidding Soon
73
All Active Projects
30
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2022

October 7, 2022

img_map_placeholder

1600 Parke Ave, Burley, ID

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.