BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2022 at 8:00 PM

Updated September 15, 2023

Site work for a road / highway in Arminto, Wyoming. Completed plans call for site work for a road / highway.

WYDOT - New Solar Array Installation in Rawhide Creek and Relocation of Existing Service Point in Orin Juction For New Solar Array Installation in Rawhide Creek: Install and connect solar array per attached Rawhide Creek RWIS 11x17 Detail Sheet and Solar Array Detail Sheets E19-E27, drawings and specifications. The cabinet is already in place and contains the batteries and surge protection, these items will not be needed. Rawhide Creek Images 5735, 5736 and 5741 indicates what is on the ground currently. Attached Solar Array Images 5744, 5745, 5748 and 5749 are for reference as to what the site is to look like once the work is completed. For Relocation of Existing Service Point in Orin Junction: Move the existing service point (1/O) approximately 120 feet to the north along the right of way fence to get it out of the drainage. 2 inch conduit and #8 AWG conductors are needed from the service point to the ITS Cabinet (approximately 120 feet) per attached Orin Junction Detail Sheets. Any and all equipment except conduit and conductors can be reused. Coordination with the local utility will be necessary for permits and/or turn off/on. Attached Images Orin Junction 20220629_123014 and 20220629_123040 show what the existing service point looks like. Award will be made on the total of both projects.

Post-Bid

Roads / Highways

$50,000.00

Public - State/Provincial

Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
16
Bidding Soon
172
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2022

October 7, 2022

Project location map

Multiple Locations, Arminto, WY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.