BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Portland, Maine. Contact the soliciting agency for additional information.

In late 2020, the Portland City Council adopted One Climate Future, the City's climate action plan. One Climate Future capitalized on foundational work around climate change from the City's comprehensive plan, Portland's Plan 2030, and proposed, among many recommendations, an approach to zoning for climate resiliency. As One Climate Future states, "If we choose to develop flood- and inundation-prone areas, our cit[y] would likely face higher rates of property damage; greater risk to health and safety; higher costs to repair and maintain city infrastructure; and more strain on city resources. We have the opportunity now to guide future development to reduce that risk from coastal flooding" (204). One Climate Future also makes a case for the city-wide risks associated with higher intensity rainstorms and high heat. The objective of the Climate Resiliency Zoning Project is to develop and integrate resiliency tools within the City of Portland's land use code. The scope will build off the work of One Climate Future's Resilience Memorandum, which suggested a set of zoning strategies that would operate at different geographies: a resiliency overlay in areas of likely flooding that would focus on adapting to risks from sea level rise and storm surge, and a city-wide set of land use standards that would focus on resilience in the face of higher intensity rainstorms and heat. The City of Portland is seeking proposals from a qualified consultant to develop a package of climate resiliency zoning amendments for integration into the City's land use code. This work will build off an approach established in the City of Portland's climate action plan, One Climate Future, and include research, public engagement, drafting, and a formal review and adoption process through the Planning Board and City Council. The Method of Contractor Selection has not been determined at this time.

Conceptual

Municipal

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
36
Bidding Soon
739
All Active Projects
247
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2023

img_map_placeholder

Multiple Locations, Portland, ME

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.