BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Oklahoma City, Oklahoma. Completed plans call for the renovation of a educational facility.

Metro Technology Centers - South Bryant Campus Public Safety Academy - Sectional Doors Bids Received More Than Ninety-six (96) Hours, Excluding Saturdays, Sundays, and Holidays, Before the Time Set for Opening Bids, as Well as Bids Received After the Time Set for Opening Bids, Will Not Be Considered and Will Be Returned Unopened. For Bids in Excess of $50,000.00, a Cashier's Check, Certified Check, or Surety Bond in the Amount of Five Percent (5%) of the Bid Shall Accompany the Sealed Proposal of Each Bidder. No Bids May Be Withdrawn After the Scheduled Closing Time for Receipt of Bids for a Period of at Least Forty-five (45) Days. The Owner Reserves the Right to Reject Any or All Bids. The Bid Shall Include All the Requirements in the Specification Sections Listed Unless Specifically Excluded Below. B. If the Scope of Work Includes Labor, Then the Successful Bidders Must Provide General Liability, Auto and Workers Compensation With Certificate Listing Additional Insured and Waiver of Subrogation in Favor of the Owner, Architect, Construction Manager and Any Others Requested at Time of Contract Issuance. C. If the Scope of Work is to Only Supply Material, Then the Successful Bidders Must Include All Labor, Materials, Services and Incidentals Required for Complete Fabrication, Manufacture and Delivery to the Project Site the Materials Included in the Designated Specification Sections and Drawings. D. If Any Bidder is Unclear as to the Scope of Work Required, Contact the Archi- Tect/construction Manager Prior to Bidding. Prior Approval is Required for All Bid Packages. Do Not Modify, Add, or Delete From Scope of Work or You Risk the Owner Setting Your Bid Aside. E. The Construction Manager May Bid on Any or Any Combination of Bid Packages, but Will Declare Such Information at the Pre-bid Conference. F. Owner Reserves Option to Award or Reject Any and All Bid Packages. If the Bid is in Excess of $50,000.00 Dollars, Payment and Performance Bonds Each in the Amount of 100% of the Contract Amount Covering Faithful Performance of the Contract, and Payment of All Obligations Arising There Under, Will Be Required by the Owner. A Warranty Bond in the Amount of 100% of the Contact Amount Covering Defective Workmanship and Materials for a Period of One Year After Acceptance of the Project Will Be Required. Premiums for the Performance, Payment and Warranty Bonds Are Included in This Proposal. It is Further Understood That, if Accepted by the Owner, This Bid Becomes a Part of the Contract Documents Upon Signing of the Contract, and Failure to Comply With Any Part of This Bid Will Be Taken as Failure to Comply With the Contract Documents, and Will Be Just Cause for Rejection of Any or All of the Work. H. Accompanying the Bid is Either (1) a Certified Check, (2) a Cashier's Check, or (3) a Bidder's Surety Bond Made Payable to the Owner for Not Less Than 5% of the Amount Submitted Herein. It is Understood That the Check or Bond Will Be Returned to the Bidder, Except That in the Event of the Owner's Acceptance of This Bid, and the Bidder Fails to Execute a Contract and File Performance and Materials and Payment Bonds Within Ten Days of the Date of the Owner's Acceptance; Then, in That Event, the Bidder's Check or Bond Will Become Property of the Owner Because of the Failure of the Bidder to Comply With the Specified Requirement. Bid Bond Must Be Accompanied by Bonding Agent's Power-of-attorney. Each Bid Shall Include Removal of All Trash and Debris Created by Each Bidder's Work. Each Bid Shall Include Delivery / Loading/ and Unloading of Materials. L. This Work Will Be Completed at Existing Structures, Site Survey is Strongly Recommended. It is Likely Class and/or Students Will Be Present During Construction, Be Prepared for Possible Shifting of Activities Based Upon Operational Needs of the School. M. This Project is Tax Exempt. N. Bid Packages Are Designed to Be Bid Separately. Combination of Bid Packages Will Be Received, but Owner Reserves the Option to Award or Reject Regardless of Pricing Implications. O. Multiple Mobilizations Are Potentially Required, Based Upon Schedules of Work. P. Change Orders Will Only Allow a Maximum of Fifteen Percent (15%) for Overhead and Profit. Descriptions Owner Furnish Items / Responsibilities Furnish and Install of All Interior and Exterior Signage. All Furnishings, Desks, Tables, Chairs, Seating, Tools, Machinery, Material Storage Units. All Instructional Aids Including Smart-boards, Monitors, Speakers, Projectors and Screens. Security Cameras, Intrusion Systems, and Access Control Systems. Data and Telecommunications Systems Bid Package 15. Overhead Sectional Doors This Separate Proposal Shall Include All Labor, Materials, Equipment, and Related Items Including Incidentals That Are Required to Complete This Scope of Work Per Complete Plans and Specifications. The Following References Specific Items to Note for This Proposal: Section 08 36 13 - Sectional Doors Includes but Not Limited to: Furnish and Install Exterior Overhead Coiling and Sectional Doors. Include Motorized Opener With Photo Eye and Safety Bar.

Post-Bid

Educational

$300,000.00

Public - City

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
48
Bidding Soon
443
All Active Projects
200
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2022

October 10, 2022

img_map_placeholder

4901 S Bryant Ave, Oklahoma City, OK

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.